Questions

Q:

Who has won Bronze Medal at World Blitz Chess Championship 2017?

A) Baadur Jobava B) Magnus Carlsen
C) Tigran Petrosian D) Viswanathan Anand
 
Answer & Explanation Answer: D) Viswanathan Anand

Explanation:

Viswanathan Anand continued his excellent run bagging a bronze in the World Blitz Chess Championship following his gold winning performance in the Rapid section.

 

  • The World Blitz Chess Championship is a chess tournament held to determine the world champion in chess played under blitz time controls. Since 2012, FIDE has held an annual joint rapid and blitz chess tournament and billed it as the World Rapid & Blitz Chess Championships.

 

  • The current world blitz champion is Magnus Carlsen.
Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: Bank Exams
Job Role: Bank PO

8 3214
Q:

In the 10th Mandala of the Rigveda, which one of the following hymns reflects upon the marriage ceremonies?

A) Surya Sukta B) Purusha Sukta
C) Dana Stutis D) Urna Sutra
 
Answer & Explanation Answer: B) Purusha Sukta

Explanation:

surya sukta--a hymn in the praise of the sun god

•dana stuti--these are hymns in the praise of those who donate

•urna sutra--is the dot/mark on the forehead that is put before performing rituals.

•purusha sukta---contains hymns about marriage ceremonies

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

1 3213
Q:

Why was the 1955 UN General Assembly called "Menon Session" or "Menon Assembly"?

Answer

Because V K Krishna Menon spoke for 13hours continuously while representing india.

Report Error

View answer Workspace Report Error Discuss

3 3213
Q:

What is Bandwidth?

Answer

Every line has an upper limit and a lower limit on the frequency of signals it can carry. This limited range is called the bandwidth

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

1 3213
Q:

Second and third class levers are differentiated by

A) the location of the load B) the location of the fulcrum
C) the presence of multiple loads D) the type of fulcrum present
 
Answer & Explanation Answer: A) the location of the load

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 3212
Q:

Why is February 28th celebrated as National Science Day ?

Answer

It was on February 28th, 1928 that CV Raman announced  his discovery of New radiation-subsequently named the Raman Effect- that won him the Noble prize.

Report Error

View answer Workspace Report Error Discuss

2 3211
Q:

Which of the following is a secondary air pollutant?

A) Acid rain B) SO2
C) CO2 D) Dust particles
 
Answer & Explanation Answer: A) Acid rain

Explanation:

Secondary pollutants include ozone, which is formed when hydrocarbons (HC) and nitrogen oxides (NOx) combine in the presence of sunlight.

 

Whereas Primary pollutant are those pollutants that are directly emitted from their sources, like CO2, CO, SO2 as these gases are directly emitted form burning of fossil fuels.

 

Acid rain, which is formed when sulfur dioxide or nitrogen oxides react with water, sulfuric acid etc.

 

Hence, Acidrain is a secondary air pollutant.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

5 3211
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3211