Questions

Q:

What is a process whereby an Ecosystem can renew itself? 

A) Succession B) Reconstruction
C) Cleansing D) Purification
 
Answer & Explanation Answer: A) Succession

Explanation:

The process which wherein an Ecosystem may renew itself is known as Ecological Succession.

The time scale may be decades or a million of years after a mass extinction. 

It may be achieve over a period of time.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

3 3465
Q:

Which vehicle is spelled the same forwards and backwards?

Answer

RACECAR.

Report Error

View answer Workspace Report Error Discuss

Subject: Word Puzzles Exam Prep: Bank Exams

52 3465
Q:

Can You Solve This Tricky Puzzle In 10 Seconds?

Answer

In the last row fifth letter is 'I'.

Report Error

View answer Workspace Report Error Discuss

Subject: Logic Puzzles Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

83 3464
Q:

Who is the author of the book "The Alchemist"?

A) Agatha Christie B) Paulo Ceolho
C) Frankenstien D) None
 
Answer & Explanation Answer: B) Paulo Ceolho

Explanation:

Paulo Ceolho is the author of The Alchemist

Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

2 3464
Q:

The first President of USA was

Answer

George Washington

Report Error

View answer Workspace Report Error Discuss

Subject: World History

2 3464
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3463
Q:

How many medals has been bagged by India in 5th Asian Indoor and Martial Arts Games ?

A) 19 B) 33
C) 27 D) 40
 
Answer & Explanation Answer: D) 40

Explanation:

With 9 gold, 12 silver and 19 bronze, India won 40 medals in 5th Asian Indoor and Martial Arts Games and finished the Games at 11th.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk

19 3463
Q:

When more than 20% of the body weight is due to fat, the person is suffering from

A) Marasmus B) Kwashiorkor
C) Scurvy D) Obesity
 
Answer & Explanation Answer: D) Obesity

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

5 3463