Questions

Q:

Why was the 1955 UN General Assembly called "Menon Session" or "Menon Assembly"?

Answer

Because V K Krishna Menon spoke for 13hours continuously while representing india.

Report Error

View answer Workspace Report Error Discuss

3 3213
Q:

Why is February 28th celebrated as National Science Day ?

Answer

It was on February 28th, 1928 that CV Raman announced  his discovery of New radiation-subsequently named the Raman Effect- that won him the Noble prize.

Report Error

View answer Workspace Report Error Discuss

2 3212
Q:

Which of the following is a secondary air pollutant?

A) Acid rain B) SO2
C) CO2 D) Dust particles
 
Answer & Explanation Answer: A) Acid rain

Explanation:

Secondary pollutants include ozone, which is formed when hydrocarbons (HC) and nitrogen oxides (NOx) combine in the presence of sunlight.

 

Whereas Primary pollutant are those pollutants that are directly emitted from their sources, like CO2, CO, SO2 as these gases are directly emitted form burning of fossil fuels.

 

Acid rain, which is formed when sulfur dioxide or nitrogen oxides react with water, sulfuric acid etc.

 

Hence, Acidrain is a secondary air pollutant.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

5 3211
Q:

Which of the following animals have teeth in their stomach?

A) Frogs B) Crabs
C) Snakes D) Cockroach
 
Answer & Explanation Answer: B) Crabs

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

21 3211
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3211
Q:

Which of the following year is considered as the first year of the Muslim calender ? 

A) AD 622 B) AD 671
C) AD 571 D) AD 651
 
Answer & Explanation Answer: A) AD 622

Explanation:

Muhammad had to leave Mecca his birth place where he started preaching and take refuse in Medina, where he was given a warm welcome. This event took place in AD 622 and is known as the year of the Hijira, or migration, which became the first year of the Muslim Calendar.

Report Error

View Answer Report Error Discuss

Filed Under: World History

3 3211
Q:

The relationship where both the participating entities belong to same entity type is called

A) Participation B) Recursive
C) Standard D) Normal
 
Answer & Explanation Answer: B) Recursive

Explanation:

The relationship where both the participating entities belong to same entity type is called Recursive relationship

Report Error

View Answer Report Error Discuss

Filed Under: Database
Job Role: Database Administration

0 3211
Q:

Which one of the following elements is a transition element?

A) H B) As
C) Fe D) Sr
 
Answer & Explanation Answer: C) Fe

Explanation:

In chemistry, the term transition metal has three possible meanings: The IUPAC definition defines a transition metal as "an element whose atom has a partially filled d sub-shell, or which can give rise to cations with an incomplete d sub-shell".

Any of the set of metallic elements occupying a central block (Groups IVB–VIII, IB, and IIB, or 4–12) in the periodic table, e.g. iron, manganese, chromium, and copper. Chemically they show variable valency and a strong tendency to form coordination compounds, and many of their compounds are coloured.

 

Here in the given options, only iron (Fe) is a transition metal since Strontium is an alkaline earth, arsenic is a metalloid, hydrogen is (normally) a diatomic gas.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 3210