Questions

Q:

How long is a term in the house of representatives?

A) 5 B) 2
C) 4 D) 6
 
Answer & Explanation Answer: B) 2

Explanation:

Members of the House of Representatives serve two-year terms and are considered for reelection every even year.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 2357
Q:

Hot springs are heated geothermally by underlying

A) water B) magma
C) mitula D) None of the above
 
Answer & Explanation Answer: B) magma

Explanation:

Magma is molten rocks beneath the earth's crust. Hot springs are heated geothermally by underlying magma.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2357
Q:

In the following question, out of the four alternatives, select the alternative which will improve the bracketed part of the sentence. In case no improvement is needed, select "no improvement". 
 
she thought she (have rediscovered) her real self after a long time

A) had rediscovered B) Had rediscover
C) had rediscovering D) no improvement
 
Answer & Explanation Answer: A) had rediscovered

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams
Job Role: Bank PO , Bank Clerk

0 2357
Q:

In the following question, some part of the sentence may have errors. Find out which part of the sentence has an error and select the appropriate option. If a sentence is free from error, select 'No Error'.

 

She is walking (1)/ in the park (2)/ since morning. (3)/ No error (4)

 

A) 1 B) 2
C) 3 D) 4
 
Answer & Explanation Answer: A) 1

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams , GRE , TOEFL

0 2357
Q:

When someone clicks your ad, the actual amount you’re charged will be

A) The minimum needed to hold your ad position, under the maximum cost-per-click limit B) The minimum needed to hold your ad position or 50% of your maximum cost-per-click bid, whichever is greater
C) The minimum needed to hold your ad position but never more than 120% of your maximum cost-per-click bid, whichever is greater D) The minimum needed to hold your ad position but never less than 50% of your maximum cost-per-click bid, whichever is greater
 
Answer & Explanation Answer: A) The minimum needed to hold your ad position, under the maximum cost-per-click limit

Explanation:

When_someone_clicks_your_ad,_the_actual_amount_you’re_charged_will_be1551856891.png image

When someone clicks your ad, the actual amount you’re charged will be " The minimum needed to hold your ad position, under the maximum cost-per-click limit ".

Report Error

View Answer Report Error Discuss

4 2356
Q:

Tides in the sea are caused by 

A) Effect of Sun B) Effect of Moon
C) Combined effect of Moon and Sun D) Gravitational Force of Earth and Sun
 
Answer & Explanation Answer: C) Combined effect of Moon and Sun

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography

0 2356
Q:

The bar graph shows the number of employees working in the different departments of a company. Study the diagram and answer the following questions

Which department has the lowest number of employees?

A) C B) D
C) A D) B
 
Answer & Explanation Answer: B) D

Explanation:
Report Error

View Answer Report Error Discuss

1 2356
Q:

What are the different job scheduling in operating systems?

Answer

Scheduling is the activity of the deciding when process will receive the resources they request.


FCS ---> FCSFS stands for First Come First Served. In FCFS the job that has been waiting the longest is served next.


Round Robin Scheduling--->Round Robin scheduling is a scheduling method where each process gets a small quantity of time to run and then it is preempted and the next process gets to run. This is called time-sharing and gives the effect of all the processes running at the same time


Shortest Job First ---> The Shortest job First scheduling algorithm is a nonpreemptive scheduling algorithm that chooses the job that will execute the shortest amount of time.


Priority Scheduling--->Priority scheduling is a scheduling method where at all times the highest priority process is assigned the resource.

Report Error

View answer Workspace Report Error Discuss

0 2356