Questions

Q:

Which of the following planets has the highest average density?

A) Jupiter B) Mars
C) Earth D) Mercury
 
Answer & Explanation Answer: D) Mercury

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: Bank Exams

1 1211
Q:

Part IV of constitution of India deals with which of the following?

A) The Union B) The States
C) Fundamental Rights D) Directive Principles of State Policy
 
Answer & Explanation Answer: D) Directive Principles of State Policy

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: Bank Exams

0 1211
Q:

Which country has approved more than 500 new settler homes in East Jerusalem?

A) USA B) UAE
C) Israel D) United Kingdom
 
Answer & Explanation Answer: C) Israel

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

0 1211
Q:

Which type of foreign investment is considered as unsafe?

A) Foreign Direct Investment (FDI) B) Portfolio investment
C) NRI deposits D) External commercial borrowing
 
Answer & Explanation Answer: B) Portfolio investment

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

0 1211
Q:

In the following question, a sentence has been given in Active/Passive Voice. Out of the four alternatives suggested, select the one which best expresses the same sentence in Passive/Active Voice.

 

Who has destroyed Nagasaki?

A) By whom Nagasaki have been destroyed? B) By whom has Nagasaki been destroyed?
C) By whom Nagasaki had been destroyed? D) By whom Nagasaki has been destroyed?
 
Answer & Explanation Answer: B) By whom has Nagasaki been destroyed?

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 1211
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


Which of the following were not problems faced while constructing the pipeline?

A) Supply shortages B) Treacherous terrain
C) Lack of funds D) Equipment breakdown
 
Answer & Explanation Answer: C) Lack of funds

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 1211
Q:

Who discovered Electron?

A) Niels Bohr B) J.J. Thomson
C) Abert Einstein D) Ernest Rutherford
 
Answer & Explanation Answer: B) J.J. Thomson

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Inventions

0 1211
Q:

Picture of which US President is on the 5 dollar note?

A) George Washington B) Thomas Jefferson
C) Abraham Lincoln D) Andrew Jackson
 
Answer & Explanation Answer: C) Abraham Lincoln

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Personalities
Exam Prep: Bank Exams

1 1211