Questions

Q:

Nematodes and arthropods both

A) are suspension feeders B) have ciliated larvae
C) develop an anus from the blastopore (pore) formed in the gastrula stage D) grow by shedding their exoskeleton
 
Answer & Explanation Answer: D) grow by shedding their exoskeleton

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2089
Q:

Which of the following cells produce antibodies?

A) Plasma cells B) Monocytes
C) Mast cells D) Neutrophils
 
Answer & Explanation Answer: A) Plasma cells

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2088
Q:

Which characteristic is a property of molecular substances?

A) good heat conductivity B) high melting point
C) good heat conductivity D) low melting point
 
Answer & Explanation Answer: D) low melting point

Explanation:

The substances in which two or more atoms are attached together are called as molecular substances. 

 

Properties of molecular substances ::

 

1. Molecular substances are bonded with covalent bonds

2. Bad heat conductivity

3. Bad electrical conductivity

4. Have low melting points.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2088
Q:

Explain compiler?

Answer

compiler is used to translate the high-level language program into machine code at a time. It doesn't require special instruction to store in a memory, it stores automatically. the execution time is less compared interpreter.


A compiler is a program that translates a source program written in some high-level programming langualge (such as Java) into machine code for some computer architecture (such as the Inter Pentium archiecture).

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2088
Q:

As a wholesaler what are the problems you would face in ensuring the commitment to your retail suppliers?

Answer

As a wholesaler, applicant should say that he/she would face production problem, growing consumption, not concentrating on important market segment, scale of operations not being proper, delivery to different stores and having some issues with suppliers and not a good relationship with suppliers. I would face these problems in reaching the target commitment to suppliers as a wholesaler.

Report Error

View answer Workspace Report Error Discuss

Subject: Retail

1 2088
Q:

In the following question, out of the four alternatives, select the alternative which is the best substitute of the words/sentence.

Extremely happy, peaceful, or picturesque

A) Idyllic B) Abominable
C) Iota D) Amiss
 
Answer & Explanation Answer: A) Idyllic

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2088
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Budgeting ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Activity cost estimates

  • Activity cost estimate supporting detail

  • Project schedule 

  • Resource calendars 

  • Contract

  • Cost management plan


II. Tools and Techniques



  • Cost aggregation

  • Reserve analysis

  • Parametric estimating 

  • Funding limit reconciliation


III. Outputs



  • Cost baseline 

  • Project funding requirements 

  • Cost management plan (updates)

  • Requested changes

Report Error

View answer Workspace Report Error Discuss

0 2087
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Activity Resource Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets

  • Activity list

  • Activity attributes

  • Resource availability

  • Project management plan


II. Tools and Techniques



  • Expert Judgment

  • Alternatives analysis

  • Published estimating data

  • Project management software

  • Bottom-up estimating


III. Outputs



  • Activity resource requirements

  • Activity atributes (updates)

  • Resource breakdown structure

  • Resource calendars (updates)

  • Requested changes

Report Error

View answer Workspace Report Error Discuss

0 2086