Questions

Q:

Who was the last Emperor of Rome ?

A) Nero B) Ceaser
C) Romulus Augustulus D) Julius
 
Answer & Explanation Answer: C) Romulus Augustulus

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History

1 2526
Q:

Father of Email

Email1498884677.jpg image

A) A B) B
C) C D) D
 
Answer & Explanation Answer: B) B

Explanation:

Ray Tomilson

Report Error

View Answer Report Error Discuss

Filed Under: Famous Personalities
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

8 2526
Q:

Explain the concept of the Distributed systems?

Answer

Distributed systems work in a network. They can share the network resources, communicate with each other.

Report Error

View answer Workspace Report Error Discuss

0 2525
Q:

Which of the following countries is not a member of the UN

A) Nepal B) Iran
C) Kampuchea D) Switzerland
 
Answer & Explanation Answer: C) Kampuchea

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Organisations

2 2525
Q:

Which among the following type of soil has the largest area covered in India?

A) Laterite B) Alluvial
C) Black D) Red
 
Answer & Explanation Answer: B) Alluvial

Explanation:

Alluvial type of soil has the largest area covered in India. Alluvial soils are fine-grained fertile soil deposited by water flowing over flood plains or in river beds. Most of the soil is Sandy and clayey soils are not uncommon.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

7 2525
Q:

What is a software project test plan?

Answer

A test plan is the master document that contains all details pertaining to testing of the application. Its contents include:


 


Testing scope - what is included and what is not included in the testing of the current project 


Assumptions - what are the assumptions that are made for this project 


Milestones - major dates like when testing is going to begin, when it is planned to end, what is the trace review date, what is the production date etc. 


Resources - the resources working on this project along with their contact details 


Defect tracking mechanism - what defect tracking tool will be used, what is the SLA for fixing Critical to Low level IRs etc. 


Test management procedures - who will be notified when there is a critical IR, what reports will be sent daily, if status calls will be held daily or weekly, where will it be held, who is required to join etc. 


Work allocation - resource distribution if more projects are being tested 


Entry and exit criterion - when can a project be accepted for testing (eg. only when smoke testing passes) and when can a project be termed as testing complete (eg. when all testcases are executed and all high level bugs are fixed)

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

3 2524
Q:

Who makes it has no need of it.

What is it?

Answer

A Coffin.

Report Error

View answer Workspace Report Error Discuss

3 2524
Q:

As the object covers equal distances in equal intervals of time, it is said to be in ____________ motion.

A) uniform B) linear
C) translational D) equilibrium
 
Answer & Explanation Answer: A) uniform

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams

13 2524