Questions

Q:

Cache memory is a form of ROM.

A) TRUE B) FALSE
Answer & Explanation Answer: B) FALSE

Explanation:

The given sentence Cache memory is a form of ROM is FALSE. Cache memory, also called CPU memory, is high-speed static random access memory (SRAM) that a computer microprocessor can access more quickly than it can access regular random access memory (RAM).

Report Error

View Answer Workspace Report Error Discuss

1 3437
Q:

Which action is the best example of a direct observation?

A) listening to a cricket chirp at night and counting the number of chirps per minute B) determining the seal population of an island by counting seals in 10 square meters of the island
C) identifying which bird was present by the tracks that it leaves in the sand at a beach D) reading numbers on a heat sensor to conclude that there is a deer in the night woods
 
Answer & Explanation Answer: A) listening to a cricket chirp at night and counting the number of chirps per minute

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 3437
Q:

What is RAID?

Answer

A method for providing fault tolerance by using multiple hard disk drives

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

5 3437
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3437
Q:

Who has topped the Forbes Magazine’s list of the world’s highest paid actors 2017 ?

A) Vin Diesel B) Jacky Chan
C) Dwayne Johnson D) Mark Wahlberg
 
Answer & Explanation Answer: D) Mark Wahlberg

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Famous Personalities
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

7 3437
Q:

What separates the components of a domain name?

A) apostrophes B) periods
C) spaces D) commas
 
Answer & Explanation Answer: B) periods

Explanation:
Report Error

View Answer Report Error Discuss

5 3436
Q:

The 2014-2015 interim budget implemented a subcharge of 10 percent on super-rich people who have having income above how much rupees in a financial year?

A) 50 Lakhs B) 1 Crore
C) 2 Crore D) 3 Crore
 
Answer & Explanation Answer: B) 1 Crore

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Job Role: Bank PO

5 3435
Q:

Who is the new Chairman of ISRO in 2018?

A) K. Sivan B) S. Manish Arya
C) A.S. Kiran Kumar D) Bibeth Roy
 
Answer & Explanation Answer: A) K. Sivan

Explanation:

Rocket specialist K. Sivan has been appointed as new Chairman of India's space agency ISRO for a three-year term. He replaces current ISRO Chairman A.S. Kiran Kumar, whose term ends January 14, 2018.

 

  • He is currently Director of Vikram Sarabhai Space Centre in Trivandrum.

 

  • His expertise gave ISRO ability to send 104 satellites in a single mission.
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank PO

10 3435