Questions

Q:

Explain the concept of the batched operating systems?

Answer

In batched operating system the users gives their jobs to the operator who sorts the programs according to their requirements and executes them. This is time consuming but makes the CPU busy all the time.

Report Error

View answer Workspace Report Error Discuss

1 2124
Q:

Project Integration Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Develop Project Charter phase?

Answer

I. Inputs



  • Contract (when applicable)

  • Project statement of work

  • Enterprise environmental factors

  • Organizational process assets


II. Tools and Techniques



  • Project selection methods

  • Project management methodology

  • Project management information system

  • Expert Judgment


III. Outputs


         1. Project charter

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

In 1236 Sultan Iltutmish’s daughter, __________, became Sultan.

A) Rehana B) Rukhsana
C) Rashida D) Raziyya
 
Answer & Explanation Answer: D) Raziyya

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

2 2123
Q:

The book 'Sudhir Sukta' was written by

A) Vishnu Wagh B) Nazir Ahmad Wani
C) Andrea Levy D) Tian Er
 
Answer & Explanation Answer: A) Vishnu Wagh

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2123
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2123
Q:

How do you differentiate the roles of Quality Assurance Manager and Project Manager?

Answer

Quality Assurance Manager (QA Manager) defines the process to be followed at each phase of SDLC. He defines the standards to be followed, the documents to be maintained and sets the standard for the product.


Where as it is the Project Manager’s responsibility to ensure that the things defined by QA manager are being implemented. He develops the product from start to finish with his team and ensures that the product which is to be rolled out is Defect free and it reaches the standards and views defined by QA Manager.


QA managers can audit the process for certain time periods which are being handled by the Project Manager.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2123
Q:

Look at the underlined part of each sentence. Below each sentence are given three possible substitutions for the underlined part. If one of them (a), (b) or (c) is better than the underlined part, indicate your response on the Answer Sheet against the corresponding letter. If none of the substitutions imporves the sentence, indicate (d) as your response on the Answer Sheet.

Your services are dispensed for.

A) from B) with
C) off D) no improvement
 
Answer & Explanation Answer: C) off

Explanation:

‘dispensed’ should be followed by ‘off’. Dispensed off means given away, therefore the sentence means that his services are no longer needed.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2123