Questions

Q:

The relationship where both the participating entities belong to same entity type is called

A) Participation B) Recursive
C) Standard D) Normal
 
Answer & Explanation Answer: B) Recursive

Explanation:

The relationship where both the participating entities belong to same entity type is called Recursive relationship

Report Error

View Answer Report Error Discuss

Filed Under: Database
Job Role: Database Administration

0 3225
Q:

Where is a hub specified in the OSI model?

A) Physical Layer B) Data Link Layer
C) Application Layer D) Session Layer
 
Answer & Explanation Answer: A) Physical Layer

Explanation:

Hubs regenerate electrical signals, which are specified at the Physical layer.

Report Error

View Answer Report Error Discuss

Filed Under: Networking
Exam Prep: CAT
Job Role: Analyst , Network Engineer

1 3224
Q:

Which of the following is known as the Electronic City of India?

A) Hyderabad B) Mumbai
C) Bengaluru D) Gurgaon
 
Answer & Explanation Answer: C) Bengaluru

Explanation:

Bengaluru city is known as the Electronic City of India. Because Electronic City is an IT hub in Anekal taluk of Bengaluru, Karnataka, India. It is one of India's largest electronic industrial parks in 3 phases i.e, in Konappana Agrahara and Doddathogur villages, Bengaluru.

Report Error

View Answer Report Error Discuss

3 3224
Q:

Which Bank has opened 9 SmartUp Zones in Bengaluru, Karnataka?

A) Axis Bank B) SBI Bank
C) Karnataka Bank D) HDFC Bank
 
Answer & Explanation Answer: D) HDFC Bank

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk

5 3224
Q:

Which of the following is a secondary air pollutant?

A) Acid rain B) SO2
C) CO2 D) Dust particles
 
Answer & Explanation Answer: A) Acid rain

Explanation:

Secondary pollutants include ozone, which is formed when hydrocarbons (HC) and nitrogen oxides (NOx) combine in the presence of sunlight.

 

Whereas Primary pollutant are those pollutants that are directly emitted from their sources, like CO2, CO, SO2 as these gases are directly emitted form burning of fossil fuels.

 

Acid rain, which is formed when sulfur dioxide or nitrogen oxides react with water, sulfuric acid etc.

 

Hence, Acidrain is a secondary air pollutant.

 

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

5 3224
Q:

The atoms of the elements which have same number of neutrons are called

A) Isobars B) Isotopes
C) Isotones D) None
 
Answer & Explanation Answer: C) Isotones

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

4 3223
Q:

Verify Scope is the process of

A) progressively elaborating and documenting the project work that produces the product of the project. B) subdividing the major product deliverables into smaller, more manageable components.
C) obtaining formal acceptance of the project scope by the stakeholders. D) influencing the factors that create scope changes to ensure that changes are agreed upon, determining that a scope change has occurred and managing the changes when and if they occur.
 
Answer & Explanation Answer: C) obtaining formal acceptance of the project scope by the stakeholders.

Explanation:

“Verify Scope is the process of formalizing acceptance of the completed project deliverables. Verifying scope includes reviewing deliverables with the customer or sponsor to ensure that they are completed satisfactorily and obtaining formal acceptance of deliverables by the customer or sponsor.” PMBOK [5.4]

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3222
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3222