Project Procurement Management

What are the Project Management Processes included in the Project Procurement Management?

Answer

The Project Procurement Management processes include the following:


Plan Purchases and Acquisitions - determining what to purchase or acquire and determining when and how.


Plan Contracting - documenting products, services, and results requirements and identifying potential sellers.


Request Seller Responses - obtaining information, quotations, bids, offers, or proposals, as appropriate.


Select Sellers - reviewing offers, choosing among potential sellers, and negotiating a written contract with each seller.


Contract Administration - managing the contract and relationship between the buyer and seller , reviewing and documenting how a seller is performing or has performed to establish required corrective actions and provide a basis for future relationships with the seller, managing contract-related changes and, when appropriate , managing the contractual relationship with the outside  buyer of the project.


Contract Closure - completing and settling each contract, including the resolution of any open items, and closing each contract applicable to the project or a project phase 

Report Error

View answer Workspace Report Error Discuss

0 2317
Q:

Which organelles are unique to plant cells?

A) Central vacuole B) Chlorophyll
C) Cell wall D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2316
Q:

Menstruation is triggered by a drop in the levels of

A) progesterone B) relaxin
C) FSH D) LH
 
Answer & Explanation Answer: A) progesterone

Explanation:

The principal hormone secreted by the corpus luteum is progesterone. Menstruation is triggered by a drop in the levels of progesterone.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE
Job Role: Analyst

4 2316
Q:

What is the adult voting age in between years of  1950-87 in India?

A) 16 years B) 18 years
C) 21 years D) 24 years
 
Answer & Explanation Answer: A) 16 years

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

6 2316
Q:

The Longest Driverless Metro in the world is________

Answer

The Dhubai Metro(UAE) consists of two driverless lines(Red and Green) that totalled 74.694 km (46.41 miles) when the Greenline was officially opened on 9 September 2011.

Report Error

View answer Workspace Report Error Discuss

1 2315
Q:

Why do you need common fields in a Database?

Answer

A database that contains multiple tables related through common fields.


A common field is a field of data that is shared among all forms in a database. Without them, it would be difficult and/or time-consuming to create other forms.

Report Error

View answer Workspace Report Error Discuss

7 2315
Q:

Where is the headquaters of the Universal postal Union

A) Switzerland B) UK
C) Iran D) India
 
Answer & Explanation Answer: A) Switzerland

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Organisations

2 2314
Q:

What are the roles of glass-box and black-box testing tools?

Answer

Glass Box (or white box) testing is the process of giving i/p to the system and checking how the system processes i/p to generate o/p


Black Box testing is the process of giving i/p to the system and checking if the system is giving correct o/p without bothering how the o/p is generated.


As we can see from the definitions, the role of black box testing is to ensure that the o/p generated is correct. And role of white box testing is to ensure that methods used to generate the o/p are correct.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2314