Q:

Other things equal an improvement in productivity will

A) shift the aggregate demand curve to the left B) shift the aggregate supply curve to the right
C) increase the equilibrium price level D) shift the aggregate supply curve to the left
 
Answer & Explanation Answer: B) shift the aggregate supply curve to the right

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 2128
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Development?

Answer

I. Inputs



  • Organizational process assets

  • Project scope statement

  • Activity list

  • Activity attributes

  • Project schedule network diagrams

  • Activity resource requirements

  • Resource calendars

  • Activity duration estimates 

  • Project management plan


                - RisK register


II. Tools and Techniques



  • Schedule network analysis

  • Critical path method

  • Schedule compression

  • What-if scenario analysis

  • Resource leveling

  • Critical chain method

  • Project management software

  • Applying calendars

  • Adjusting leads and lags 

  • Schedule model


III. Outputs



  • Project schedule

  • Schedule model data

  • Schedule baseline

  • Resource requirements (updates)

  • Activity attributes (updates)

  • Project calendar (updates)

  • Requested changes

  • Project management plan (updates)


                 - Schedule management plan(updates)

Report Error

View answer Workspace Report Error Discuss

0 2127
Q:

Hydro-electric power provides more than 90% of the total power consumed in 

A) Norway B) Sweden
C) India D) UK
 
Answer & Explanation Answer: A) Norway

Explanation:

The short and swift streams running down the Scandinavian mountains have been harnessed for power which also compensates for the absence of coal and oil.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 2127
Q:

What's the speed and device maximum specs for Firewire?

Answer

IEEE 1394 (Firewire) supports the maximum of 63 connected devices with speeds upto 400 Mbps.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2127
Q:

Which works are protected by copyright?

A) Ideas B) Architectural works
C) Procedures D) Names
 
Answer & Explanation Answer: B) Architectural works

Explanation:

 

 Copyright law safeguards the expression of thoughts and facts, not simply the thoughts and actualities. Thoughts are fair diversion for everybody to express in their own words.

 

Works that are protected by copyright are ::

 

Literary works,

 

Musical works, including any accompanying words

 

Dramatic works, including any accompanying music

 

Pantomimes and choreographic works

 

Pictorial, graphic, and sculptural works

 

Motion pictures and other audiovisual works

 

Sound recordings

 

Architectural works.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

3 2127
Q:

First opposition leader of Rajya Sabha?

A) Niranjan Mishra B) Shyam Nandan Mishra
C) Dr. Rajendra Prasad D) Rama Kanth Mishra
 
Answer & Explanation Answer: B) Shyam Nandan Mishra

Explanation:

Shri Shyam Nandan Mishra was Leader of the Opposition in the Rajya Sabha from December 1969 to March 1971. He was imprisoned in connection with the Quit India Movement during 1942–1943.

first_opposition_leader_of_rajya_sabha1558595047.jpg image

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2127
Q:

What is the general formula for a straight-chain alkane?

A) C2nH2n+3. B) CnH2n+2
C) CnH2n D) CnH3n+2.
 
Answer & Explanation Answer: B) CnH2n+2

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 2127
Q:

Project Scope Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Scope control ?

Answer

I. Inputs



  • Project scope statement

  • Work breakdown structure

  • WBS dictionary

  • Project scope management plan

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Change control system

  • Variance analysis

  • Replanning

  • Configuration management system


III. Outputs



  • Project scope statement(updates)

  • Work breakdown structure(updates)

  • WBS dictionary (updates)

  • Scope baseline (updates)

  • Requested changes

  • Recommended  corrective action

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2126