Questions

Q:

A sentence/a part of the sentence is underlined. Four alternatives are given to the underlined part which will improve the sentence. Choose the correct alternative and click the button corresponding to it. In case no improvement is needed, click the button corresponding to “No improvement”.

The police had to break the door to get in

A)  to break up  B)  to break in 
C)  to break down  D)  No improvement 
 
Answer & Explanation Answer: C)  to break down 

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: TOEFL , GRE , CAT

0 2096
Q:

The chemical makeup of a rock is

A) Nutrients B) Minerals
C) Metals D) Water
 
Answer & Explanation Answer: B) Minerals

Explanation:

The chemical composition of a rock is mainly minerals.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2095
Q:

Project-75 India, sometimes seen in news, is associated with which Indian armed force?

A) Indian Army B) Indian Air Force
C) Indian Coast Guard D) Indian Navy
 
Answer & Explanation Answer: D) Indian Navy

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2095
Q:

The first Indian communication satellite was

A) Aryabhatta B) Bhaskara-I
C) Apple D) Chandrayaan-I
 
Answer & Explanation Answer: C) Apple

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: Bank Exams

3 2095
Q:

Which of the following Gods are also known as Lokapalas or the Guardians of the Universe?

A) Yama, Indra, Varuna and Kubera B) Indra, Varuna, Skanda and Kubera
C) Indra,Varuna, Yama and Brahma D) Yama, Shiva, Kubera and Indra
 
Answer & Explanation Answer: A) Yama, Indra, Varuna and Kubera

Explanation:

In Hinduism, the guardians of the cardinal directions are called the Lokapālas, or Dikpalaka. Aṣṭa-Dikpāla ("Guardians of Eight Directions")

1.Kubera (North)

2.Yama (South)

3.Indra (East)

4.Varuṇa (West)

5.Īśāna (Northeast)

6.Agni (Southeast)

7.Vayu (Northwest)

8.Nirṛti (Southwest)

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

0 2095
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2095
Q:

Project Management Process Groups

What are the Project Management Process Groups?

Answer

This section identifies and describes the five Project Management Process Groups required for any project. These five process Groups have clear dependencies and are performed in the same sequence on each project.


The five Process Groups are :


Initiating  Process Group - Defines and authorizes the project or a project phase


Planning Process Group - Defines and refines objectives, and plans the course of action required to attain the objectives and scope that the project was undertaken to address.


Executing Process Group - Integrates people and other resources to carry out the project management plan for the project


Monitoring and Controlling process Group - Regularly measures and monitors progress to identify variances from the project management plan so that corrective action can be taken when necessary to meet project objectives.


Closing Process Group - Formalizes acceptance of the product, service or result and brings the project or a project phase to an orderly end.

Report Error

View answer Workspace Report Error Discuss

0 2095
Q:

Length of two trains are 150 m and 200 m respectively and the ratio (shorter: longer) of their speed is 2 : 5. If they cross each other in opposite direction in 15 second then in what time faster train will overtake the slower train.

A) 20 seconds B) 25 seconds
C) 32 seconds D) 35 seconds
 
Answer & Explanation Answer: D) 35 seconds

Explanation:

Let speed of slower train = 2x
⇒ speed of faster train = 5x
ATQ, (150 + 200)/(2x + 5x) = 15
x = 10/3
Time required=350/[50/3–20/3]= 35 seconds

Report Error

View Answer Report Error Discuss

0 2095