Questions

Q:

The taper on the lathe spindle is

A) 1 in 10 B) 1 in 20
C) 1 in 15 D) 1 in 25
 
Answer & Explanation Answer: B) 1 in 20

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

4 2129
Q:

The force exerted on an object is 200 N and its mass is 100 kg. Find the acceleration of the object.

A) 2 m/s B) 2 m
C) 2 m/sq.s D) 2 s
 
Answer & Explanation Answer: C) 2 m/sq.s

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: CAT , Bank Exams , AIEEE

0 2129
Q:

Which energy source generates the least greenhouse gases?

A) Fossil fuels energy B) Nuclear energy
C) Solar energy D) All of the above
 
Answer & Explanation Answer: A) Fossil fuels energy

Explanation:

Fossil fuels energy source generates the least greenhouse gases. Of them, i.e, oil, natural gas and coal, natural gas source generates the least greenhouse gases.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2128
Q:

India’s fastest indigenous train Train18, which will run from Delhi to Varanasi, named as

A) Vande Bharat Express B) Bharat Express
C) Vandemataram Express D) Sapthagiri Express
 
Answer & Explanation Answer: A) Vande Bharat Express

Explanation:

India’s fastest indigenous train Train18, which will run from Delhi to Varanasi, named as Vande Bharat Express.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2128
Q:

What's the speed and device maximum specs for Firewire?

Answer

IEEE 1394 (Firewire) supports the maximum of 63 connected devices with speeds upto 400 Mbps.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2128
Q:

Length of two trains are 150 m and 200 m respectively and the ratio (shorter: longer) of their speed is 2 : 5. If they cross each other in opposite direction in 15 second then in what time faster train will overtake the slower train.

A) 20 seconds B) 25 seconds
C) 32 seconds D) 35 seconds
 
Answer & Explanation Answer: D) 35 seconds

Explanation:

Let speed of slower train = 2x
⇒ speed of faster train = 5x
ATQ, (150 + 200)/(2x + 5x) = 15
x = 10/3
Time required=350/[50/3–20/3]= 35 seconds

Report Error

View Answer Report Error Discuss

0 2128
Q:

The difference between Greenwich Mean Time & Indian Standard Time is

A) 6 1/2 Hours B) 6 Hours
C) 5 1/2 Hours D) 5 Hours
 
Answer & Explanation Answer: C) 5 1/2 Hours

Explanation:

The difference between Greenwich Mean Time & Indian Standard Time is 5 1/2 hours.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2128
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Development?

Answer

I. Inputs



  • Organizational process assets

  • Project scope statement

  • Activity list

  • Activity attributes

  • Project schedule network diagrams

  • Activity resource requirements

  • Resource calendars

  • Activity duration estimates 

  • Project management plan


                - RisK register


II. Tools and Techniques



  • Schedule network analysis

  • Critical path method

  • Schedule compression

  • What-if scenario analysis

  • Resource leveling

  • Critical chain method

  • Project management software

  • Applying calendars

  • Adjusting leads and lags 

  • Schedule model


III. Outputs



  • Project schedule

  • Schedule model data

  • Schedule baseline

  • Resource requirements (updates)

  • Activity attributes (updates)

  • Project calendar (updates)

  • Requested changes

  • Project management plan (updates)


                 - Schedule management plan(updates)

Report Error

View answer Workspace Report Error Discuss