Questions

Q:

What is the hierarchy in the structure of the House?

A) The Speaker is at the top, and the whips are at the bottom. B) The floor leaders are at the top, and the members are at the bottom.
C) The members are at the top, and the floor leaders are at the bottom. D) The Speaker is at the top, and the members are at the bottom.
 
Answer & Explanation Answer: D) The Speaker is at the top, and the members are at the bottom.

Explanation:

Hierarchy is a method to structure an establishment employing various levels of administration and a vertical section, or series of command, between higher and lower levels of the organization. Superior levels dominate lower levels of the bureaucracy.

 

The Speaker is at the top, and the members are at the bottom.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 3196
Q:

What is the minimum age required to become vice-president of India?

A) 30 years B) 35 years
C) 40 years D) 37 years
 
Answer & Explanation Answer: B) 35 years

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: Bank Exams

3 3196
Q:

Visceral fat is stored chiefly ____

A) within subcutaneous adipocytes B) around the thighs and neck
C) around the abdominal organs D) within the liver and spleen 
 
Answer & Explanation Answer: C) around the abdominal organs

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: Bank Exams

3 3196
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Control ?

Answer

I. Inputs



  • Cost baseline

  • Project funding requirements

  • performance reports

  • Work performance information

  • Approved change requests

  • Project management plan


II. Tools and Techniques



  • Cost change control system

  • Performance measurement analysis

  • Forecasting

  • Project performance reviews

  • Project management software 

  • Variance management


III. Outputs



  • Cost estimate (updates)

  • Cost baseline (updates)

  • Performance measurements

  • Forecasted completion

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)


 

Report Error

View answer Workspace Report Error Discuss

0 3195
Q:

Which Indian born scientist was awarded the Nobel prize in Astrophysics

A) Prof Chandra Shaker B) Sir C.V.Raman
C) Satyendra Nath Bose D) Vikram Sarabhai
 
Answer & Explanation Answer: A) Prof Chandra Shaker

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

1 3195
Q:

Which of the following governs and regulates telecommunication in India?

A) TRAI B) BHEL
C) HAL D) NMDC
 
Answer & Explanation Answer: A) TRAI

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness

2 3193
Q:

Trip planning helps reduce

A) Stress B) Driving distance
C) Both A & B D) Insurance costs
 
Answer & Explanation Answer: C) Both A & B

Explanation:

Trip planning helps reduce Driving distance and stress. We can preplan the trip how to go, where to go first, from where the spot is near and what the places to be seen there and the total estimation for the trip.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 3193
Q:

Project Procurement Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Contract Administration?

Answer

I. Inputs



  • Contract

  • Contract management plan

  • Selected sellers

  • Performance reports

  • Approved change requests

  • Work performance information


II. Tools and Techniques



  • Contract change control system

  • Buyer-conducted performance review

  • Inspections and audits

  • Performance reporting

  • Payment system

  • Claims administration

  • Records management system

  • Information technology


III. Outputs



  • Contract documentation 

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)


                 - Procurement management plan


                 - Contract management plan

Report Error

View answer Workspace Report Error Discuss

0 3192