Questions

Q:

The strength of an electromagnet can be increased by

A) increasing the length of the coiled wire B) increasing current supply
C) increasing the number of turns D) All of the above
 
Answer & Explanation Answer: D) All of the above

Explanation:

The strength of an electromagnet can be increased by increasing the cross-sectional area, increasing the number of turns, increasing current supply, increasing the length of the coiled wire.

 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2334
Q:

One of the following was not associated with the Gadar party

A) Lala Hardayal B) Baba Gurdit Singh
C) Mohammad Barkatullah D) Sohan Singh Bhakna
 
Answer & Explanation Answer: B) Baba Gurdit Singh

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams

1 2334
Q:

Who became the first-ever Indian javelin-thrower to win an Asian Games gold medal 2018?

A) Manjit Singh B) Neeraj Chopra
C) Amit Panghal D) Manika Batra
 
Answer & Explanation Answer: B) Neeraj Chopra

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2334
Q:

Dihang is the other name for the Indian river

A) Indus B) Brahmaputra
C) Narmada D) Chenab
 
Answer & Explanation Answer: B) Brahmaputra

Explanation:

Indian river Brahmaputra is also known as Dihang.

Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

5 2333
Q:

What are the different job scheduling in operating systems?

Answer

Scheduling is the activity of the deciding when process will receive the resources they request.


FCS ---> FCSFS stands for First Come First Served. In FCFS the job that has been waiting the longest is served next.


Round Robin Scheduling--->Round Robin scheduling is a scheduling method where each process gets a small quantity of time to run and then it is preempted and the next process gets to run. This is called time-sharing and gives the effect of all the processes running at the same time


Shortest Job First ---> The Shortest job First scheduling algorithm is a nonpreemptive scheduling algorithm that chooses the job that will execute the shortest amount of time.


Priority Scheduling--->Priority scheduling is a scheduling method where at all times the highest priority process is assigned the resource.

Report Error

View answer Workspace Report Error Discuss

0 2333
Q:

The mass of a mole of NaCl is the

A) 58.44 gm/mol B) 57.25 gm/mol
C) 56.31 gm/mol D) 59.14 gm/mol
 
Answer & Explanation Answer: A) 58.44 gm/mol

Explanation:

To get the mass of a mole of NaCl, we need to add the molar atomic weights of the individual elements i.e, Na and Cl

Atomic weights of Na = 22.99 gm/mol  Cl = 35.45 gm/mol

 

Now, mass of a mole of NaCl = 22.99 + 35.45 = 58.44 gm/mol.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

0 2333
Q:

Can you work in shifts?

Answer

Say “Yes” if you have made up your mind to work for a call center. Call centers would usually work 24 X 7 which needs some executives to be always present in the center. This means that you would need to work in shifts. 

Report Error

View answer Workspace Report Error Discuss

Subject: Call Center

1 2332
Q:

French Revolution was started in the Year ?

A) 1786 B) 1787
C) 1788 D) 1789
 
Answer & Explanation Answer: D) 1789

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World History

1 2332