Questions

Q:

Complete the analogy 3 : 11 :: 7 : ___

A) 29 B) 18
C) 24 D) 51
 
Answer & Explanation Answer: D) 51

Explanation:
Report Error

View Answer Report Error Discuss

4 2097
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule

Report Error

View answer Workspace Report Error Discuss

0 2096
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2096
Q:

Bending of light rays in denser medium is termed as:

A) Reflection B) Dispersion
C) Refraction D) Deflection
 
Answer & Explanation Answer: C) Refraction

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

1 2096
Q:

In the following question, out of the four alternatives, select the alternative which is the best substitute of the words/sentence.

A routine task, especially a household one

A) Chore B) Servitude
C) Moil D) Travail
 
Answer & Explanation Answer: A) Chore

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English

0 2096
Q:

Protists and bacteria are grouped into different domains because

A) protists have a membrane-bounded nucleus, which bacterial cells lack. B) protists eat bacteria
C) bacteria decompose protists D) protists are photosynthetic
 
Answer & Explanation Answer: A) protists have a membrane-bounded nucleus, which bacterial cells lack.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2095
Q:

Which two functional groups are always found in amino acids?

A) Carbonyl and amine B) Ketone and amine
C) Amine and carboxyl D) Aldehyde and amine
 
Answer & Explanation Answer: C) Amine and carboxyl

Explanation:

The two functional groups Amine and carboxyl groups are always found in amino acids.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

4 2095
Q:

A body of mass 5 kg accelerates from 12 m/s to 20 m/s in 4 seconds due to the application of a force on it. Calculate the magnitude of this force (in N).

A) 40 B) 10
C) 20 D) 80
 
Answer & Explanation Answer: B) 10

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

1 2095