Q:

Which formula represents a nonpolar molecule?

A) H2O B) CF4
C) HCl D) H2S
 
Answer & Explanation Answer: B) CF4

Explanation:

You have to consider three things.

1. First, are the bonds polar?

Look at differences in electronegativity and if  it is >0.5, bonds are polar.

 

2. Second, does the molecule have unshared electron pairs?

If so, they generally lead to a polar molecule.

 

3. Third, is the molecule symmetric?

If so, then although the bonds may be polar, the symmetry cancels out the individual bond polarity and the molecule is non polar.

CF4 follows all the rules above and has a symmetric distribution of charge, making it nonpolar. The others all have asymmetric charge distributions.

 

Hence, CF4 represents a Non-polar molecule.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 4350
Q:

Which Stack is used in 8086?

Answer

FIFO (First In First Out) stack is used in 8086. In this type of Stack the First Stored Information is retrieved first.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 4349
Q:

Prime Minister Narendra Modi flagged off the third Mahamana Express running between_______ .

A) Delhi and Lucknow B) Vadodara and Varanasi
C) Patna and Delhi D) Vadodara and Delhi
 
Answer & Explanation Answer: B) Vadodara and Varanasi

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams
Job Role: Bank Clerk

13 4349
Q:

A bond formed by the transfer of electrons between atoms of the elements is called

A) Ionic bond B) Covalent bond
C) Co-ordinate bond D) Hydrogen bond
 
Answer & Explanation Answer: A) Ionic bond

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

5 4348
Q:

Which letter indicates systolic pressure?

A) i B) b
C) c D) a
 
Answer & Explanation Answer: D) a

Explanation:

a -  at the peak of changes in blood pressure indicates the systiolic pressure.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

7 4347
Q:

Who was the  Indian cricketer honored with CK Naidu Lifetime Achievement  Award in 2014 ?

A) Kapil Dev B) Sachin Tendulkar
C) Rahul Dravid D) M S Dhoni
 
Answer & Explanation Answer: A) Kapil Dev

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Honours and Awards

1 4345
Q:

Which newspaper has acquired 67 per cent stake in Kolkata-based daily The Asian Age?

A) Hindustan Times B) Times of India
C) Deccan Chronicle D) The Hindu
 
Answer & Explanation Answer: C) Deccan Chronicle

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness

11 4343
Q:

You are working on a new project to develop a new wireless product with ease - of - use features recommended by customers. It is as yet undetermined which features and the extent to which each feature will be incorporated into the product.You have a focus group that will continue to evaluate the features as the project goes forward.The focus group is authorized to suggest changes, as are your engineers and the quality department.As a project manager, what will help you most to minimize the effect of these changes?

A) A change management plan B) A scope management plan
C) Do not continue with the project until all of the features are clearly defined in the scope statement and scope definition. D) This is an expected part of every project. A good project manager will have a communications plan in place to be sure everyone knows what is happening on the project.
 
Answer & Explanation Answer: B) A scope management plan

Explanation:

Answer A is tempting because the problem focuses on changes. However, because we are talking about the elaboration of the product's characteristics, we are talking about scope changes, and therefore Answer B is the best answer. Answer C is also tempting because it is difficult to more forward on a project until the scope is clearly defined (especially in systems development projects), but with products and certain types of web development, scope changes can be frequent, and a formal scope management plan is needed. Answer D is true from a project perspective, but does not addres the scope issues.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 4342