Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2093
Q:

Project Management Process Groups

What are the Project Management Process Groups?

Answer

This section identifies and describes the five Project Management Process Groups required for any project. These five process Groups have clear dependencies and are performed in the same sequence on each project.


The five Process Groups are :


Initiating  Process Group - Defines and authorizes the project or a project phase


Planning Process Group - Defines and refines objectives, and plans the course of action required to attain the objectives and scope that the project was undertaken to address.


Executing Process Group - Integrates people and other resources to carry out the project management plan for the project


Monitoring and Controlling process Group - Regularly measures and monitors progress to identify variances from the project management plan so that corrective action can be taken when necessary to meet project objectives.


Closing Process Group - Formalizes acceptance of the product, service or result and brings the project or a project phase to an orderly end.

Report Error

View answer Workspace Report Error Discuss

0 2092
Q:

Project Quality Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Perform Quality Assurance?

Answer

I. Inputs



  • Quality management plan

  • Quality metrics

  • Process improvement plan 

  • Work performance information 

  • Approved change requests

  • Quality control measurements 

  • Implemented change requests

  • Implemented corrective actions 

  • Implemented defect repair

  • Implemented preventive actions 


II. Tools and Techniques



  • Quality planning tools and techniques

  • Quality audits

  • Process analysis 

  • Quality control tools and techniques


III. Outputs



  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2092
Q:

Fastest batsman to score 19000 international runs?

A) Brian Lara B) Virat Kohli
C) Sachin Tendulkar D) Sunil Gavaskar
 
Answer & Explanation Answer: B) Virat Kohli

Explanation:

Virat Kohli has become the fastest batsman to score 19000 international runs in just 299 matches.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2092
Q:

What are the minimal cost and minimal risk solution?

Answer

In binary representation there are some states that believed to be never occurred due to some particular functionality of a given circuit. If zero output is assigned to such states then it is called minimal risk solution as  we are resetting the formidable states which could be occurred accidentally. Another approach is to assigned a don't care to them so it results in lesser logic and hence is called minimal cost solution.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2092
Q:

Why the temporary registers W and Z are named so i mean we start from A, B, C, D, E then H and L coz H stands for higher bit and L for lower bit of the address pinted by memory pointer.. but wats W and Z for?

Answer

As W and Z alphabets are not widely used similarly as W and Z is internally used they would have been named so

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2092
Q:

Valve between the left ventricle and Aorta?

A) Pulmonic valve B) Tricuspid valve
C) Aortic valve D) Mitral valve
 
Answer & Explanation Answer: C) Aortic valve

Explanation:

The Aortic valve - located between the left ventricle and the aorta

The Mitral valve - located between the left atrium and left ventricle

The Tricuspid valve - located between the right atrium and the right ventricle (and) 

The Pulmonary (pulmonic) valve - located between the right ventricle and the pulmonary artery.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

5 2092
Q:

Rearrange the parts of the sentence in correct order.
It is for the government,
P-especially one with such a
Q-significant majority, to have the
R-intelligence and leadership to think long term

A) QRP B) PQR
C) RPQ D) QPR
 
Answer & Explanation Answer: B) PQR

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2092