Questions

Q:

Alum is used 

A) as an analgesic B) in the purification of water
C) as a fertilizer D) as a disinfectant
 
Answer & Explanation Answer: B) in the purification of water

Explanation:

Alum is a common alum, potassium aluminum sulphate K2SO4.Al2SO43.24H2O which makes colloidally suspended impurities in water such as clay to settle down.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE

4 3874
Q:

Reuptake refers to the

A) reabsorption of excess neurotransmitter molecules by a sending neuron B) release of hormones into the bloodstream
C) movement of neurotransmitter molecules across a synaptic gap D) inflow of myelin through an axon membrane
 
Answer & Explanation Answer: A) reabsorption of excess neurotransmitter molecules by a sending neuron

Explanation:

Reuptake refers to the process in the brain of neurons to retrieve chemicals that were not received by the next neuron. Neurons are cells in the brain that have miniscule spaces between them. They communicate with each other by sending chemicals across the space to the next neuron.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

2 3873
Q:

What Animals are Warm Blooded?

A) Reptiles B) Insects
C) Amphibians D) Birds
 
Answer & Explanation Answer: D) Birds

Explanation:

Mammals and Birds are Warm-blooded Animals.

Warm-blooded animals have body temperatures that usually stay the same Whether it is sunny and hot outside or there is a snowstorm.They are able to regulate their body temperature which changes with temperature of environment.

 

  • Warm Blooded Animals :: Apes, Monkeys, Whales, Elephants, Cheetahs, Giraffes, Pets, Felines, Pigs and Humans(all other live birth bearing creatures that nurse their young)..

 

  • Cold Blooded Animals :: All Reptiles, Amphibians, Fish as well as Insects (Bugs).
Report Error

View Answer Report Error Discuss

Filed Under: Animals and Birds
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank PO

16 3873
Q:

An important tool for project scope management is

A) Fast tracking B) Work breakdown structure
C) Crashing D) A Gantt Chart
 
Answer & Explanation Answer: B) Work breakdown structure

Explanation:

Work breakdown structure is an important tool for project scope management.

 

Project Scope Management refers to the set of processes that ensure a project’s scope is accurately defined and mapped. Scope Management techniques enable project managers and supervisors to allocate just the right amount of work necessary to successfully complete a project—concerned primarily with controlling what is and what is not part of the project’s scope.

Report Error

View Answer Report Error Discuss

14 3873
Q:

How would you choose the best media to promote your advertisement?

Answer

It depends on the following factors:



  •        Reach

  •        Geographical spread

  •        Nature of target audience/clusters

  •        Previous successful track records

  •        Low budget; high returns etc. 

Report Error

View answer Workspace Report Error Discuss

9 3873
Q:

Which is the second most abundant metal in the earth's crust

A) Iron B) Aluminum
C) Copper D) Zinc
 
Answer & Explanation Answer: B) Aluminum

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography

1 3871
Q:

Excess of fat in the body is stored in

A) Adipose tissue B) Acrosome
C) Erythrocytes D) Bone marrow
 
Answer & Explanation Answer: A) Adipose tissue

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

10 3870
Q:

 ________ is a simple object model that is easier to understand and use than OLE DB, and is frequently used for database applications.

A) ASP B) XML
C) ODBC D) ADO
 
Answer & Explanation Answer: D) ADO

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Database

0 3870