Questions

Q:

The organs protected by the thoracic cage include the

A) lungs B) heart
C) both a & b D) None of the above
 
Answer & Explanation Answer: C) both a & b

Explanation:

The organs protected by the thoracic cage include the lungs and the heart.

The_organs_protected_by_the_thoracic_cage_include_the1563453679.jpg image

 

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

7 3254
Q:

The sentence that states the main idea of the paragraph

A) Thesis B) Topic sentence
C) Both A & B D) None of the above
 
Answer & Explanation Answer: C) Both A & B

Explanation:

The sentence that states the main idea of the paragraph is called as Thesis or the topic sentence.

Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 3254
Q:

Shock resisting steels should have

A) toughness B) low wear resistance
C) low tensile strength D) low hardness
 
Answer & Explanation Answer: A) toughness

Explanation:

Shock resisting steels should have toughness.

S-5 is a silico-manganese shock resisting steel that offers good ductility.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 3254
Q:

Warts are contagious.

A) TRUE B) FALSE
Answer & Explanation Answer: A) TRUE

Explanation:

Yes. Warts are contagious.


You can get warts from touching a wart on someone else's body or by coming in contact with surfaces that touched someone's warts, such as towels or bathmats.


warts_are_contagious1532510865.jpg image


 


Hence, the given statement that, 'Warts are contagious' is TRUE.

Report Error

View Answer Workspace Report Error Discuss

Subject: General Science
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 3254
Q:

Who has been appointed by Flipkart as an in-charge of the newly acquired e-Bay India business ?

A) Anil Goteti B) S Aparna
C) Rajeev Kumar D) Kalyan Krishnamurthy
 
Answer & Explanation Answer: A) Anil Goteti

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

9 3253
Q:

Compared to land, the open oceans

A) are rich in silica and iron B) are nutrient-poor environments
C) contain unlimited nitrogen D) are nutrient-rich environments
 
Answer & Explanation Answer: B) are nutrient-poor environments

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

1 3253
Q:

PAS is a drug used in the treatment of

A) Cancer B) Typhoid
C) Malaria D) Tuberculosis
 
Answer & Explanation Answer: D) Tuberculosis

Explanation:

Para-amino salicylic acid (PAS) is used in the treatment of Tuberculosis.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry

4 3253
Q:

Project Integration Management

What are the Project Management Processes included in the Project Integration Management?

Answer

The Integrative Project Management Processes include:


Develop Project Charter - Developing the project charter that formally authorizes a project or a project Phase.


Develope Preliminary Project Scope Statement - Developing the preliminary project scope statement that provides a high level scope narrative


Develop Project Management Plan -  Documenting the actions necessary to define, prepare, integrate, and coordinate all subsidiary plans into a project management plan.


Direct and Manage Project Execution- Executing the work defined in the project management plan to achieve the project's requirements defined in the project scope statement.


Monitor and Control Project Work - Monitoring and controlling the processes used to initiate, plan, execute, and close a project to meet the performance objectives defined in the project management plan.


Integrated Change Control - Reviewing all change requests, approving changes, and controlling changes to the deliverables and organizational process assets.


Close Project - Finalizing all activities across all of the Project Management Process Groups to formally close the project or a Project phase.

Report Error

View answer Workspace Report Error Discuss

0 3253