Questions

Q:

Read the passage carefully and select the best answer to each question out of the given four alternatives.

 

India’s title triumph in the Under-19 cricket World Cup at the Bay Oval in New Zealand seemed inevitable. Prithvi Shaw’s boys, astutely coached by Rahul Dravid, maintained an unbeaten record through their three-week sojourn. The rousing campaign commenced with a 100-run win against Australia on January 14; in subsequent games, Papua New Guinea, Zimbabwe, Bangladesh and Pakistan were all emphatically defeated. There were no big-game nerves and even in the much- hyped semifinal against Pakistan, India pocketed a facile 203-run victory. In the summit clash against Australia, Shaw’s boys followed their template of dominance.

Australia was bowled out for 216 and India cruised home in 38.5 overs with eight wickets to spare, and enjoyed the added lustre of opener Manjot Kalra’s unbeaten 101. Through the tournament India found diverse heroes. Fittingly, its batting troika of Shaw, Kalra and Shubman Gill, along with seamer Kamlesh Nagarkoti and spinner Anukul Roy, found a berth in the International Cricket Council’s Under-19 World Cup team, essentially a tribute to the best players on view in the championship. Cricketing excellence allied with the resultant celebrity status, especially during the teenage years, can be a double-edged sword and it helped that in the dressing room there was the calming presence of Dravid. As the ecstatic players leapt and photo-bombed after clinching the trophy, Dravid cut through the hype and said that this win should not be the team’s defining memory as each individual cricketer has much more to achieve in his career. Dravid has a point. India has won the Under-19 World Cup on four occasions, including the previous golden runs in 2000, 2008 and 2012. From among these champion sides, only a few graduated to the big stage. Yuvraj Singh and Virat Kohli came through the under-19 ranks and managed to carve a niche for themselves, but Unmukt Chand, who led the team to the Cup in 2012, and then featured in a soft drink advertisement besides writing a book, has been unable to make it to the Indian senior team.

 

Which one quality of Rahul Dravid is mentioned in the passage as a captain of U-19 Cricket team of India?

A) Calmness B) Dominate
C) Aggressiveness D) Sincerity
 
Answer & Explanation Answer: A) Calmness

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2124
Q:

Explain the concept of the batched operating systems?

Answer

In batched operating system the users gives their jobs to the operator who sorts the programs according to their requirements and executes them. This is time consuming but makes the CPU busy all the time.

Report Error

View answer Workspace Report Error Discuss

1 2124
Q:

PQR is right angled at Q. If cosecP = 17/15, then what is the value of sinR ?

A) 15/17 B) 11/17
C) 8/17 D) 13/17
 
Answer & Explanation Answer: C) 8/17

Explanation:
Report Error

View Answer Report Error Discuss

1 2124
Q:

Project Integration Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Develop Project Charter phase?

Answer

I. Inputs



  • Contract (when applicable)

  • Project statement of work

  • Enterprise environmental factors

  • Organizational process assets


II. Tools and Techniques



  • Project selection methods

  • Project management methodology

  • Project management information system

  • Expert Judgment


III. Outputs


         1. Project charter

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

Project Communications Management

What are the Project Management Processes included in the Project Communications Management?

Answer

Communications planning - Determining the information and communications needs of the project stakeholders.


Information Distribution - Making needed information available  to project stakeholders in a timely manner.


Performance Reporting - Collecting and distributing performance information. This includes status reporting, progress measurement, and forecasting.


Manage Stakeholders - Managing communications to satisfy the requirements of and resolve issues with project stakeholders.

Report Error

View answer Workspace Report Error Discuss

0 2124
Q:

In 1236 Sultan Iltutmish’s daughter, __________, became Sultan.

A) Rehana B) Rukhsana
C) Rashida D) Raziyya
 
Answer & Explanation Answer: D) Raziyya

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

2 2123
Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2123
Q:

How do you differentiate the roles of Quality Assurance Manager and Project Manager?

Answer

Quality Assurance Manager (QA Manager) defines the process to be followed at each phase of SDLC. He defines the standards to be followed, the documents to be maintained and sets the standard for the product.


Where as it is the Project Manager’s responsibility to ensure that the things defined by QA manager are being implemented. He develops the product from start to finish with his team and ensures that the product which is to be rolled out is Defect free and it reaches the standards and views defined by QA Manager.


QA managers can audit the process for certain time periods which are being handled by the Project Manager.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

0 2123