Questions

Q:

How to prepare for TOEFL iBT essay writing part?

There are four sections of TOEFL iBT exam (Reading, Listening, Speaking and Writing). The 4th section is to write an essay about one topic.

Answer

Yes, you are requested to write an essay as part of your TOEFL iBT exam. There are 5 major types for TOEFL essay topics. They are:


 


1. Agree or Disagree


2. Preference


3. Description / Explanation


4. If / Imaginary


5. Compare & Contrast


 


The best way to prepare for this essay writing is to understand the writing style clearly. To understand the the genre, you can refer some sample essays submitted before by different contestants. You can get such sample TOEFL essays from various sources such as TOEFL training websites, cheap essay writing service sites, online libraries, etc. Once you are well aware of the writing pattern the next thing is to practice writing random essays. Keep in mind that you should practice writing essays of all above mentioned 5 types. If you make it a routine to write random essays, gradually you can compete at higher level to write the given essay topic for your TOEFL iBT exam.

Report Error

View answer Workspace Report Error Discuss

Subject: General Awareness Exam Prep: TOEFL

33 4830
Q:

How many languages are contained in the  VIIIth schedule of the Indian Constitution?

A) 18 B) 22
C) 16 D) 12
 
Answer & Explanation Answer: B) 22

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness

3 4829
Q:

The biogenetic law was proposed by

A) Alfred Russel Wallace B) Charles Darwin
C) Ernst von Haeckel D) Lamarck
 
Answer & Explanation Answer: C) Ernst von Haeckel

Explanation:

The biogenetic law states that ontogeny (study of development) repeats phylogeny (origin from previous group of racial history), The young one of the frog namely the tadpole is like a fish cosidered to be ancestral to frog.

Report Error

View Answer Report Error Discuss

Filed Under: Biology

9 4828
Q:

Pinaka is a

A) a multi barrel rocket launcher developed by DRDO B) a rocket launcher developed by France
C) a missile developed by DRDO D) a missile imported from Russia
 
Answer & Explanation Answer: A) a multi barrel rocket launcher developed by DRDO

Explanation:

1. Pinaka is a multi barrel rocket launcher developed by the Defence Research and Development Organisation (DRDO) for the Indian Army.

2. The system has a maximum range of 40 km for Mark-I and 75 km for Mark-II, and can fire a salvo of 12 rockets in 44 seconds.

3. The system is mounted on a Tatra truck for mobility.

4. Actually, the meaning of Pinaka is Shiv Dhanush.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank PO , IT Trainer

7 4827
Q:

After the ruin of India's trade, industries and handicrafts, the burden of taxation in india had to be mainly borne by

A) Zamindars B) Peasantry
C) Income-tax-payers D) All the above
 
Answer & Explanation Answer: B) Peasantry

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History

4 4826
Q:

The kilo calories of energy released from one gram of fats is

A) 5.49 B) 4.59
C) 9.45 D) 9.54
 
Answer & Explanation Answer: C) 9.45

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology

16 4825
Q:

Which memory management technique involves dividing the memory into fixed sized blocks ?

A) Paging B) Scaling
C) Whiping D) Tracking
 
Answer & Explanation Answer: A) Paging

Explanation:

Paging is a memory management technique in which process address space is broken into blocks of the same size called pages.

Report Error

View Answer Report Error Discuss

Filed Under: Operating Systems
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk

2 4824
Q:

Assuming that the phases in a project are concept, development, implementation and termination, which phase typically has the highest degree of uncertainty?

A) Concept B) Development
C) Implementation D) Termination
 
Answer & Explanation Answer: A) Concept

Explanation:

The first phase in a project always has the greatest degree of uncertainty because at this point in time the product is the least well defined. PMBOK, See figure 2-2. [2.1.1]

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 4822