Questions

Q:

What contributes to antigenic shift in influenza viruses?

A) a segmented genome B) different virus subtypes
C) Both A & B D) ease of virus transmission
 
Answer & Explanation Answer: A) a segmented genome

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE
Job Role: Analyst

3 2136
Q:

The functional connection between two neurons is a

A) Axon B) Synapse
C) Neuroglia D) Dendrites
 
Answer & Explanation Answer: B) Synapse

Explanation:

The functional connection between two neurons is a Synapse.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2136
Q:

Which city is the venue of the World Government Summit 2019?

A) Dubai B) Hyderabad
C) New York D) Singapore
 
Answer & Explanation Answer: A) Dubai

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2136
Q:

In what year was pluto devoted to a draft planet?

A) 2005 B) 2006
C) 2008 D) 2009
 
Answer & Explanation Answer: B) 2006

Explanation:

In 2006, pluto devoted to a draft planet.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

0 2136
Q:

Select the antonym of
to remand

A) to filibuster B) to tarry
C) to expedite D) to adjourn
 
Answer & Explanation Answer: C) to expedite

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2136
Q:

Project Life Cycle

What is the Project Life Cycle?

Answer

Project managers or the organization can divide projects into phases to provide better management control with appropriate links to the ongoing operations of the performing organization. Collectively, these phases are known as the project life cycle.

Report Error

View answer Workspace Report Error Discuss

0 2136
Q:

Project Time Management - Processes

Describe the Inputs, Tools and Techniques, Outputs of Schedule Control ?

Answer

I. Inputs



  • Schedule management plan

  • Schedule baseline

  • Performance reports

  • Approved change requests


II. Tools and Techniques



  • Progress reporting

  • Schedule change control system

  • Performance measurement

  • Project management software

  • Variance analysis

  • Schedule comparision bar charts


III. Outputs



  • Schedule model data (updates)

  • Schedule baseline (updates)

  • Performance measurements

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Activity list (updates)

  • Activity attributes (updates)

  • Project management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2135
Q:

Light travels in a straight line (rectilinear propagation of light). This statement does hold if the medium of travel for light is

A) of variable refractive index B) made up of slabs of different refractive indices
C) homogeneous and transparent D) inhomogeneous and transparent
 
Answer & Explanation Answer: C) homogeneous and transparent

Explanation:

In vacuum and in homogeneous, transparent media, such as air, water, and glass, light moves in a straight line. When light encounters a boundary between two different transparent media, some light is reflected and some moves from the first into the second medium.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: Bank Exams

1 2135