Questions

Q:

Higher Quality Scores typically result in

A) faster delivery of daily budget B) higher costs and lower ad positions
C) lower costs and better ad positions D) less overall impressions
 
Answer & Explanation Answer: C) lower costs and better ad positions

Explanation:

Higher Quality Scores typically result in lower costs and better ad positions. Quality Score is Google's rating of the quality and relevance of both your keywords and PPC ads. It is used to determine your cost per click (CPC) and multiplied by your maximum bid to determine your ad rank in the ad auction process.

Report Error

View Answer Report Error Discuss

Filed Under: Advertising and Media
Job Role: Analyst , IT Trainer

4 3106
Q:

Name the mountain that seperates France and Spain

A) Alps B) Pyrenees
C) Jura D) Vosges
 
Answer & Explanation Answer: B) Pyrenees

Explanation:

Pyrenees, a chief mountain in Europe, forms a part of the great mountain across Europe and Asia.

Report Error

View Answer Report Error Discuss

Filed Under: World Geography

0 3105
Q:

Which of the following is a Decomposition Reaction?

A) 2HgO ----> 2Hg + O2 B) 6NaNO3 ----> 6NaNO2 + 3O2
C) ZnCO3 ----> ZnO + CO2 D) All the above
 
Answer & Explanation Answer: D) All the above

Explanation:

All the given reactions are Decomposition reactions.

Decomposition reaction is a reaction in which only one reactant is splitted into two or more products.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 3105
Q:

One of the main issues discussed in the 40th Ministrial Meeting of the ASEAN held in August, 2007 was 

A) America's overstay in Iraq B) Presidential Election in Pakistan
C) Draft blueprint of the ASEAN Charter D) The 123 Agreement between India and USA
 
Answer & Explanation Answer: C) Draft blueprint of the ASEAN Charter

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams
Job Role: Bank PO

1 3105
Q:

Which phase change is an example of an exothermic process?

A) Liquid to Solid B) Gas to Solid
C) Gas to Liquid D) All the above
 
Answer & Explanation Answer: D) All the above

Explanation:

Processes that require or give off heat will be limited to changes of state, known as phase changes, and changes in chemical constitution, or chemical reactions. Changes of state involve a solid melting, a liquid freezing, a liquid boiling or a gas condensing.

 

An exothermic process is one that gives off heat, which is transferred to the surroundings. An endothermic process is a reaction which heat has to be supplied to the system from the surroundings.

 

Here in all the given options, heat is taken away from them to change there phase. 

Liquid to Solid --- Freezing

Gas to Liquid --- Condensation

Gas to Solid --- Deposition 

are all examples of exothermic processes.

 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

6 3104
Q:

Who wrote the line: ' A thing of beauty is a joy for ever '

A) P.B.Shelley B) William Wordsworth
C) John Keats D) Robert Browning
 
Answer & Explanation Answer: C) John Keats

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

1 3104
Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 3103
Q:

Integration is primarily concerned with

A) ensuring that the time, scope and cost baselines are consistent with an acceptable quality standard and with the customer’s expectations. B) getting people working together effectively toward common project goals through appropriate training, management and leadership.
C) effectively integrating the processes among the project management process groups that are required to accomplish project objectives with an organization’s defined procedures. D) ensuring that all the tools and techniques of the various planning processes are appropriately scaled to the complexity and risk exposure of the project.
 
Answer & Explanation Answer: C) effectively integrating the processes among the project management process groups that are required to accomplish project objectives with an organization’s defined procedures.

Explanation:

Answers A, B and D all result from effectively integrating the work of the project management process groups. PMBOK [4.0]

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3103