Questions

Q:

Which tennis player has won the Grand Slam title in men's singles 2019?

A) Rafael Nadal B) Roger Federer
C) Novak DJokovic D) Daniil Medvedev
 
Answer & Explanation Answer: A) Rafael Nadal

Explanation:

Rafael Nadal defeated Daniil Medvedev in the men's singles title at the 2019 US Open. It was Nadal's 19th Grand Slam singles title, and fourth US Open title.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

38 3515
Q:

Which structure is common to plant and animal cells?

A) Centriole B) Chloroplast
C) Central Vacuole D) Mitochondria
 
Answer & Explanation Answer: D) Mitochondria

Explanation:

Mitochondria are present in both plant and animal cells.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 3514
Q:

Radio waves sent out by a radio stations are reflected by

A) troposphere B) stratosphere
C) mesosphere D) ionosphere
 
Answer & Explanation Answer: D) ionosphere

Explanation:

This is a layer of atmosphere about 60 to 70 km above the earth and extends to about 400km. It contains ionised particles which can reflect radio waves making radio communication round the world possible.

Report Error

View Answer Report Error Discuss

Filed Under: Physics

2 3514
Q:

How many cups in a quart?

A) 2 B) 3
C) 4 D) 1
 
Answer & Explanation Answer: C) 4

Explanation:

1 quart = 4 cups.

=> We know that 1 quart = 2 pints

But 1 pint = 2 cups

=> 2 pints = 2 x 2 cups = 4 cups = 1 quart.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

4 3513
Q:

Which of the following sports is most popular worldwide?

A) Football B) Hockey
C) Cricket D) Tennis
 
Answer & Explanation Answer: A) Football

Explanation:

Top five most popular games world wide are :

 

Game name              -      Estimated  fans     -    Popular Regions

 

1. Soccer / Football      -      3.5 Billion    -     Europe, Africa, Asia, America

2. Cricket                    -      2.5 Billion     -    Asia, Australia, UK

3. Basketball               -      2.2 Billion     -    US, Canada, China and Philippines

4. Field Hockey           -       2 Billion       -     Europe, Africa, Asia, Australia

5. Tennis                    -       1 Billion       -     Europe, Americas, and Asia.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

1 3512
Q:

Which type of simple sugar is found primarily in fruit?

A) Sucrose B) Fructose
C) Maltose D) Lactose
 
Answer & Explanation Answer: B) Fructose

Explanation:

The main simple sugar found in fruit is Fructose. Glucose is found naturally occurring in fruits and other plants. But fructose is sweeter than glucose and can give you more energy. That's why a piece of fruit in the morning will give you more energy than a cup of coffee!

 

Fructose is what gives most fruits that sweet flavor and in combination with the acids present in certain fruits can give a pleasantly tangy flavor.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

1 3512
Q:

When is International Talk Like a Pirate Day is observed?

A) December 11 B) September 16
C) March 8 D) September 19
 
Answer & Explanation Answer: D) September 19

Explanation:
Report Error

View Answer Report Error Discuss

37 3512
Q:

The project life cycle can be broken into five phases that tend to overlap with each other frm one phase to another;however ,the control phase does not overlap with a specific phase. why?

A) Change control management is seperate from the other phases B) Change control management has a plan that can be usede throughout the initiation, planning, execution, and closeout of the project
C) Because the project sponsor is responsible for change control management , the project manager is not involved with that phase of the project D) Change control extends throughout the entire project from initiation to closeout
 
Answer & Explanation Answer: D) Change control extends throughout the entire project from initiation to closeout

Explanation:

Change control management is utilized from the begining to the end of the project in order to keep it focused with an emphasis on the time and budget. Answer A is incorrect because change control management is not seperate from the other phases. Answer B is incorrect because the control plan must be throughout the other phases of a project. Its usage is not optional, and consistent utilization is imperative to managing scope creep and other scope expansions. Answer C is incorrect because the project sponsors is generally not responsible for the change control documentation, although it should be involved in the buy-in and approval process.

Report Error

View Answer Report Error Discuss

Filed Under: PMP Certification

0 3511