Q:

K can finish the work in 18 days and L can do the same work in 15 days. L worked for 10 days and left the job. In how many days, K alone can finish the remaining work ?

A) 5.5 days B) 6 days
C) 4.2 days D) 5 days
 
Answer & Explanation Answer: B) 6 days

Explanation:

L's 10 days work = 115×10=23

 


Remaining work = 1-23=13

 


Now,  work is done by K in one day = 1/18

 

1/3 work is done by K in  18×13 = 6 days

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

5 3144
Q:

Raghu can complete a work in 12days working 9 hours a day. Arun can complete the same work in 8 days working 11 hours a day. If both Raghu and Arun work together, working 12 hours a day, in how many days can they complete the work ?

A)3449 days   

B)12449 days 

C)4349 days    

D)41249 days

A) Option A B) Option B
C) Option C D) Option D
 
Answer & Explanation Answer: C) Option C

Explanation:

Raghu can complete the work in (12 x 9)hrs = 108 hrs.

 

 Arun can complete the work in (8 x 11)hrs = 88 hrs.

 

Raghu's 1 hrs work = 1/108 and Arun's 1 hrs work = 1/88

 

(Raghu + Arun)'s 1 hrs work = 1108+188=492376

 
So, both Raghu and Arun will finish the work in 237649 hrs

Number of days of 12 hours each=237649×112 = 19849=4349 days

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

6 6985
Q:

P and Q can do a work in 4 hours and 12 hours respectively. P starts the work at 9am and they work alternately for one hour each. When will the work be completed ?

A) 3 am B) 12 pm
C) 1 pm D) 3 pm
 
Answer & Explanation Answer: D) 3 pm

Explanation:

Work done by P and Q in the first two hours, working alternately

= First hour P + Second hour Q

14+112=13

work is completed in 2 hours

Then, the total time required to complete the work by P and Q working alternately=2 x 3= 6hours

Thus, work will be completed at 3pm.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

10 6908
Q:

K is 4 times as fast as L and working together, they can complete a work in 24 days. In how many days can L alone complete the work ?

A) 30 days B) 40 days
C) 120 days D) 80 days
 
Answer & Explanation Answer: A) 30 days

Explanation:

Given K=4L 

-->K+L = 4L+L = 5L

 

These 5L people can complete the work in 24 days, which means L alone can do the work in (24 x 5)=120 days.

 

Hence, K alone can do the work in 120/4= 30 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

4 4551
Q:

I travel 20 miles towards north and then travel 25 miles eastward. I then travel 40 miles rightwards, then travel 30 miles towards left and then travels 12 miles to the left and finally 20 miles northwards. How far am i pproximately from my original destination and in what direction ?

A) 20 miles towards south B) 13 miles towards south-west
C) 12 miles towards east D) 13 miles towards north-east
 
Answer & Explanation Answer: B) 13 miles towards south-west

Explanation:

k41483341709.jpg image

 Using pythagorus rule, 

 x2=122+52

 --> x = 13

Report Error

View Answer Report Error Discuss

Filed Under: Direction Sense Test
Exam Prep: GATE , CAT , Bank Exams
Job Role: Network Engineer , Bank PO , Bank Clerk

38 9788
Q:

Who wins The World's Best Playmaker of the year 2016 ?

A) Lionel Messi B) Toni Kroos
C) Riyad Mahrez D) Andres Iniesta
 
Answer & Explanation Answer: A) Lionel Messi

Explanation:

Argentine Star Lionel Messi was chosen as the World’s Best Playmaker for the year 2016 on December 29, 2016, by the International Federation of Football History and Statistics (IFFHS). Messi topped the list with 172 points followed by Andres Iniesta at second spot with 66 points and Toni Kross third with 45 points.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

8 3704
Q:

Which Wins Patent for Flying Warehouse to Deliver Parcels via Drones ?

A) Flipkart B) Snapdeal
C) Amazon D) Paytm
 
Answer & Explanation Answer: C) Amazon

Explanation:

The U.S. e-commerce giant, Amazon has been awarded a patent for launching a giant flying warehouse that would acts as a launch pad for drones to deliver items within minutes.The patent reveals plans for setting up an “Airborne Fulfillment Center” (AFC) such as an Airship or Blimp, floating at an altitude of around 45,000 and stocked with lots of products especially in area where the demand for certain items is expected to be high. When a customer places an order, a drone or unmanned aerial vehicles (UAV) will fly down and deliver the package. The patent claims that this would require little or no power because the drone would be gliding down rather than having to take off and land.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: Bank Exams , CAT , GATE , GRE
Job Role: Bank Clerk , Bank PO

10 4668
Q:

Which number replaces 'x' in the below figure ?

k11483336561.jpg image

A) 2 B) 9
C) 11 D) 12
 
Answer & Explanation Answer: B) 9

Explanation:

k11483336735.jpg image

 

Here in 2nd column if you add the individual digits

 we get  3 + 7 + 0 =10 , 2 + 2 + 4 = 8 , 7 + 3 + 0 = 10

 

7   10   3  --> 7+3 =10

 

6   8     2  --> 6+2 =8

 

x   10   1  --> x+1 =10

 

Here we can observe that by adding 1st and 3rd column elements we get 2nd column elements

 --> x = 9

Report Error

View Answer Report Error Discuss

Filed Under: Inserting The Missing Character
Exam Prep: GRE , GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

48 4221