Questions

Q:

Infiltration is the process by which rainwater becomes

A) river water B) ground water
C) salt water D) ocean water
 
Answer & Explanation Answer: B) ground water

Explanation:

The process of absorbtion of rain water by the soil on the earth is called infiltration. By this process, the rain water that falls on the soil becomes ground water.

Report Error

View Answer Report Error Discuss

Filed Under: Chemistry
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2084
Q:

What would be the output of the following program?

main()

{

    float a = 0.7;

    if ( a < 0.7f )

          printf ( " C ");

    else 

          Printf ( " C++ ");

}

Answer

C++

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

0 2084
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Estimating ?

Answer

I. Inputs



  • Enterprise environmental factors

  • Organizational process assets 

  • Project scope statement

  • Work breakdown structure

  • WBS dictionary 

  • Project management plan


             - Schedule management plan


             - Staffing management plan


             - Risk register


II. Tools and Techniques



  • Analogous estimating

  • Determine resource cost rates

  • Bottom-up estimating

  • Parametric estimating

  • Project management software

  • Vendor bid analysis

  • Reserve analysis

  • Cost of quality


III. Outputs



  • Activity cost estimates 

  • Activity cost estimate supporting detail 

  • Requested changes

  • Cost management plan (updates)

Report Error

View answer Workspace Report Error Discuss

0 2084
Q:

Demand side market failures occur when

A) supply curves do not reflect the full cost of producing a good or services B) demand curves do not reflect consumer’s full willingness to pay for goods or services
C) government imposes tax on a good or a service D) a good or service is not produced because no one demands it
 
Answer & Explanation Answer: B) demand curves do not reflect consumer’s full willingness to pay for goods or services

Explanation:

Market failure arises because it is not possible for the market to correctly weight cost and benefits in a situation in which some of the cost is completely unaccounted.

Demand-side market failures happen when demand curves do not reflect consumer’s full willingness to pay for goods or services.

Supply-side market failures occur when supply curves do not reflect the full cost of producing a good or services.

Report Error

View Answer Report Error Discuss

Filed Under: Marketing and Sales
Exam Prep: Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

1 2084
Q:

What would be the output of the following program?

main()

{

    int i = -3, j =2, k =0, m ;

    m = ++j && ++i || ++k ;

    Printf ( "\n%d%d%d%d", i , j , k , m );

}

Answer

-2  3  0  1

Report Error

View answer Workspace Report Error Discuss

Subject: Programming

1 2083
Q:

In 1617 the British East India Company was given permission by __________ to trade in India.

A) Babur B) Akbar
C) Aurangzeb D) Jahangir
 
Answer & Explanation Answer: D) Jahangir

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian History
Exam Prep: Bank Exams

3 2083
Q:

Project Time Management

What are the Project Management Processes included in the Project Time Management?

Answer

Activity Definition - Identifying the Specific schedule activities that need to be performed to produce the various project deliverables.


Activity Sequencing - Identifying and documenting dependencies among schedule activities


Activity Resource Estimating - Estimating the type and quantities of resources required to perform each schedule activity


Activity Duration Estimating - Estimating the number of work periods that will be needed to complete individual schedule activities


Schedule Development - Analyzing activity sequences, durations, resource requirements, and schedule constraints to creae the project schedule.


Schedule Control - Controlling changes to the project schedule

Report Error

View answer Workspace Report Error Discuss

0 2083
Q:

Which country won the team event at 1st Mallakhamb World Championship?

A) China B) Nepal
C) Japan D) India
 
Answer & Explanation Answer: D) India

Explanation:

India emerged as winners in the team event at the first Mallakhamb World Championship held in Mumbai.

Report Error

View Answer Report Error Discuss

Filed Under: Sports
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2083