Q:

Synapsis occurs during

A) Mitosis B) Meiosis
C) Both A & B D) None
 
Answer & Explanation Answer: B) Meiosis

Explanation:

Synapsis is the pairing of two homologous chromosomes that occurs during meiosis. It allows matching-up of homologous pairs prior to their segregation, and possible chromosomal crossover between them.

Synapsis takes place during prophase I of meiosis.

It is also called as Syndesis.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst

3 3202
Q:

During which process is water produced?

A) Acetyl COA formation B) Electron transport chain
C) Alcohol fermentation D) citric acid cycle
 
Answer & Explanation Answer: B) Electron transport chain

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , GATE
Job Role: Analyst , Bank Clerk , Bank PO

3 3201
Q:

Which of the following governs and regulates telecommunication in India?

A) TRAI B) BHEL
C) HAL D) NMDC
 
Answer & Explanation Answer: A) TRAI

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Awareness

2 3200
Q:

Which Indian born scientist was awarded the Nobel prize in Astrophysics

A) Prof Chandra Shaker B) Sir C.V.Raman
C) Satyendra Nath Bose D) Vikram Sarabhai
 
Answer & Explanation Answer: A) Prof Chandra Shaker

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

1 3200
Q:

What is schema?

Answer

The description of a data base is called the database schema , which is specified during database design and is not expected to change frequently . A displayed schema is called schema diagram .We call each object in the schema as schema construct.

Report Error

View answer Workspace Report Error Discuss

Subject: Database
Job Role: Database Administration

0 3199
Q:

Trip planning helps reduce

A) Stress B) Driving distance
C) Both A & B D) Insurance costs
 
Answer & Explanation Answer: C) Both A & B

Explanation:

Trip planning helps reduce Driving distance and stress. We can preplan the trip how to go, where to go first, from where the spot is near and what the places to be seen there and the total estimation for the trip.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

2 3199
Q:

What is the hierarchy in the structure of the House?

A) The Speaker is at the top, and the whips are at the bottom. B) The floor leaders are at the top, and the members are at the bottom.
C) The members are at the top, and the floor leaders are at the bottom. D) The Speaker is at the top, and the members are at the bottom.
 
Answer & Explanation Answer: D) The Speaker is at the top, and the members are at the bottom.

Explanation:

Hierarchy is a method to structure an establishment employing various levels of administration and a vertical section, or series of command, between higher and lower levels of the organization. Superior levels dominate lower levels of the bureaucracy.

 

The Speaker is at the top, and the members are at the bottom.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Politics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 3199
Q:

Project Cost Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Cost Control ?

Answer

I. Inputs



  • Cost baseline

  • Project funding requirements

  • performance reports

  • Work performance information

  • Approved change requests

  • Project management plan


II. Tools and Techniques



  • Cost change control system

  • Performance measurement analysis

  • Forecasting

  • Project performance reviews

  • Project management software 

  • Variance management


III. Outputs



  • Cost estimate (updates)

  • Cost baseline (updates)

  • Performance measurements

  • Forecasted completion

  • Requested changes

  • Recommended corrective actions

  • Organizational process assets (updates)

  • Project management plan (updates)


 

Report Error

View answer Workspace Report Error Discuss