Questions

Q:

Which of these best describes genetic drift?

A) Random fluctuations in the gene frequencies within a population Eliminate B) The combining of alleles to create more genetic variations within a population
C) The movement of alleles between population D) A planned method to reduce the number of inferior genes in a population
 
Answer & Explanation Answer: A) Random fluctuations in the gene frequencies within a population Eliminate

Explanation:

Random fluctuations in the gene frequencies within a population Eliminate is the one which best describes genetic drift.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

1 2359
Q:

The thyroid hormone that regulates carbohydrate metabolism is

A) Parathyroid B) Thyroxin
C) Parathormone D) Estrogen
 
Answer & Explanation Answer: B) Thyroxin

Explanation:

Thyroxin or Thyroxine is the thyroid hormone that regulates carbohydrate metabolism in the human body.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2359
Q:

The most common economic system in the world is a

A) Mixed B) Command
C) Planned D) Market
 
Answer & Explanation Answer: A) Mixed

Explanation:

Mixed economy is the most common economic system in the world.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

0 2359
Q:

Is boiling water a chemical change?

Answer

No. Boiling water is not a chemical change. Because in this process it doesn't loss its properties. It just changes its state i.e, from liquid state to gaseous.


 


Hence, Boiling water is a Physiacl change and not a chemical change.

Report Error

View answer Workspace Report Error Discuss

0 2358
Q:

4 phases of project management are

Answer

The project management life cycle describes high-level processes for delivering a successful project.


The project management life cycle is usually broken down into four phases:


1. Initiation and Planning,


2. Execution,


3. Project Monitoring and Control, and


4. Project Closing.

Report Error

View answer Workspace Report Error Discuss

11 2358
Q:

The wrist is what to the hand?

A) Deep B) Proximal
C) Lateral D) Superior
 
Answer & Explanation Answer: B) Proximal

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk

4 2358
Q:

Project Management - Introduction

What is a Project? What are its Characteristics?

Answer

A Project is a temporary endeavour undertaken to create a unique product, service or result.


Characteristics:


1.Temporary 


    Temporary means that every project has a definite beginning and a definite end.


2. Unique Products, Services or Results


   Uniqueness is an important characteristic of project deliverables. For example, many thousands of office buildings have been developed, but each individual facility is unique - different owner, different design, different location, different contractors, and so on.


3. Progressive Elaboration


   Progressive elaboration means developing in steps, and continuing by increments . For example, the project scope will be broadly described early in the project and made more explicit and detailed as the project team develops a better and more complete understanding of the objectives and deliverables.

Report Error

View answer Workspace Report Error Discuss