A can do a piece of work in 8 days and B can do it in 10 days seperately. How many days would it take for both A and B to finish the same work together?
The length, breadth and height of a cuboid are in the ratio 19 : 11 : 13. If length is 30 cm more than height, then what is the volume (in cub.cm) of this cuboid?
PQ is a diameter of a circle with centre O. RS is a chord parallel to PQ subtends an angle of 40° at the centre of the circle. If PR and QS are produced to meet at T, then what will be the measure (in degrees) of ∠PTQ?
Shrenik switched on a bulb at 2 : 39 : 40 hours and switched it off on the same day at 12 : 30 : 34 hours. For how long was the bulb in switched-on mode?