Searching for "5%"

Q:

How much does one need to add to 4/5 to obtain 5/4?

A) 16/20 B) 1/-1
C) 1.25/0.8 D) 9/20
 
Answer & Explanation Answer: D) 9/20

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: Bank Exams

Q:

Select the option that can replace the question mark (?) in the Problem Figure.

 

 

 

A) 1 B) 2
C) 3 D) 4
 
Answer & Explanation Answer: D) 4

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Image Analysis
Exam Prep: Bank Exams

Q:

A person driving at the speed of 45 kmph reaches office 1 minute early while she reaches 3 minutes late if driving 40 kmoh. What is the distance (in Km) that she is covering?

 

A) 24 B) 28
C) 32 D) 30
 
Answer & Explanation Answer: D) 30

Explanation:

Difference in time taken = 4min = 1/15 hr

Let the total distance covered by person be D km.

Then,

D/40 – D/45 = 1/15

⇒ 5D = 120

⇒ D = 24 km

∴ Distance covered by person is 24 km.

 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance
Exam Prep: Bank Exams

Q:

The ratio of the number of marbles that Pulak and Menaja had was 5:9 while the ratio of the number of marbles that Jairam and Menaja had was 7:18. What is the ratio of the number of marbles that Pulak and Jairam had?

 

A) 10:7 B) 2:3  
C) 5:7 D) 7:5
 
Answer & Explanation Answer: A) 10:7

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Ratios and Proportions
Exam Prep: Bank Exams

Q:

A sump is filled by three tankers with uniform flow. The first two tankers operating simultaneously fill the sump in the same time during which the sump is filled by the third tanker alone. The second tanker fills the sump 5 hours faster than the first tanker and 4 hours slower than the third tanker. The time required by the first tanker is:

 

A) 16hours B) 9hours
C) 10hours D) 15hours
 
Answer & Explanation Answer: D) 15hours

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Pipes and Cistern
Exam Prep: Bank Exams

Q:

Type 1 workers are 2.5 times as efficient as type 2 workers. Twelve Type 1 workers can complete a task in 10 days. How many days would it have taken 4 Type 1 and 15 Type 2 workers to do the same work?

 

A) 13 B) 10
C) 12 D) 11
 
Answer & Explanation Answer: D) 11

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: Bank Exams

Q:

From the top of a platform 5 m high, the angle of elevation of a tower was 30 deg. If the tower was 45 m high, how far away from the tower was the platform positioned?

A) 15√3 m B) 40√3 m
C) 45√3 m D) 40 m
 
Answer & Explanation Answer: B) 40√3 m

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Height and Distance
Exam Prep: Bank Exams

Q:

84% of a number is 105. The number is :

A) 120 B) 115
C) 112 D) 125
 
Answer & Explanation Answer: D) 125

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: Bank Exams