Searching for "BEST"

Q:

In the following question, out of the four alternatives, select the alternative which best expresses the meaning of the idiom/phrase.

Alphabet soup

A) A beautiful poem. B) A text which nourishes your soul.
C) A book that is close to your heart. D) A confusing or confused mixture of things
 
Answer & Explanation Answer: D) A confusing or confused mixture of things

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

In the following question, out of the four alternatives, select the alternative which best expresses the meaning of the idiom/phrase.

At short notice

A) With little warning or time for preparation. B) To ignore something important at your own peril.
C) To notice a small leak which can sink a ship. D) Inform somebody that they are fired from a job.
 
Answer & Explanation Answer: A) With little warning or time for preparation.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

A sentence has been given in Direct/Indirect Speech. Out of the four given alternatives, select the one which best expresses the same sentence inIndirect/Direct Speech.

“Where do you come from?” asked the stranger.

A) The stranger enquired about my location. B) The stranger enquired where I came from.
C) The stranger says where do I come from. D) The stranger asked where did I came from
 
Answer & Explanation Answer: B) The stranger enquired where I came from.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

A sentence has been given in Active/Passive Voice. Out of the four given alternatives, select the one which best expresses the same sentence inPassive/Active Voice.

The cat teased the rat.

A) The rat is teased by the cat. B) The rat was teased by the cat.
C) The rat got tease by the cat. D) The rat was subject to teasing by the cat.
 
Answer & Explanation Answer: B) The rat was teased by the cat.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

In the following question, out of the given four alternatives, select the one which best expresses the meaning of the given word.

Erroneous

A) Proper B) Regretful
C) Dull D) Invalid
 
Answer & Explanation Answer: D) Invalid

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

In the following question, out of the given four alternatives, select the one which best expresses the meaning of the given word.

Prudent

A) Unwise B) Frugal
C) Careless D) Improper
 
Answer & Explanation Answer: B) Frugal

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


Which of the following were not problems faced while constructing the pipeline?

A) Supply shortages B) Treacherous terrain
C) Lack of funds D) Equipment breakdown
 
Answer & Explanation Answer: C) Lack of funds

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


How was the fund for pipeline - construction generated?

A) 8 major oil companies joined hands to share the cost B) 8 major oil companies borrowed $8 billion.
C) A single private company raised $8 billion D) Oil rights were sold to 8 major oil companies
 
Answer & Explanation Answer: A) 8 major oil companies joined hands to share the cost

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams