Searching for "no"

Q:

Of the items listed below, which are not features of configuration?

A. Project documentation     B. Transport change requests.

C. Test case assignment       D. Configure img objects

E. Generate blueprint

Answer

Answer : B , E

Report Error

View answer Workspace Report Error Discuss

Q:

Which of the following statements about pro forma invoices are correct?

A. In copying control for proforma invoices, the quantity/value plus/minus field is not configurable

B. Account determination procedure is assigned to a proforma invoice

C. In copying control for proforma invoices, the quantity/value plus/minus field must be set to "plus"

D. Account determination procedure is always not assigned to a proforma invoice

Answer

Answer : A , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP SD

Q:

The system does a forward scheduling if...

A. Material availability date falls ater today's date

B. If backward scheduling is configured

C. Material availability date falls beyond today's date

D. If backward scheduling is not configured

Answer

Answer : C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP SD

Q:

Which of the following MRP areas do not exist?

A. Consignment MRP area
B. Plant MRP area
C. Storage location MRP area
D. Subcontractor MRP area

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

Q:

What is the purpose of specifying a planning horizon?

A.  Only materials manifesting a planning-relevant change within the planning horizon are taken into account in the MRP run (where NETPL is used).
B.  To specify whether forecasts are included in the material requirement calculation.

C. To specify that only externally procured (and not internally procured) items are included in the net change MRP run.

D. To specify whether a NETCH (net change in complete horizon) or a NETPL (net change in planning horizon) will take place in the next MRP run.

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

Q:

You enter a goods issue and receive the following message: "W: On , only 0.000 pieces are available". What do you conclude from this?

A. The message represents a warning which you can ignore by pressing the ENTER key.

B. The material exist in the specified storage location on the current day, however, it is unavailable, because of other reservations.

C. No stocks of the material exist anywhere in the entire plant.  Therefore, nothing can be withdrawn

D. Only the specified storage location does not contain any stocks of the material.  Therefore, nothing can be withdrawn.

Answer

Answer : A , B

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

Q:

My SAP Business Suite contains the following:

A. Technology

B. Cross-Industry Solutions

C. Services

D. Industry Solutions

Answer

Answer : A ,B ,C ,D


 


Explanation: mySAP Business Suite is a family of open business solutions that integrates people, information, and processes to drive efficiency  and profitabilit y from business relationships. mySAP Business Suite features cross-industry solutions, industry solutions,  technological in frastructure, and services

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

Q:

Which screen area(s) in the transaction for goods movements MIGO cannot be closed?

A. Item overview

B. Header data

C. Overview tree

D. Detail data for item

Answer

Answer : A


 


Explanation: Excluding the item overview, you can open and close all screen  areas
individual ly in the MIGO transaction.

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM