Q:

What is a software project test plan?

Answer

A test plan is the master document that contains all details pertaining to testing of the application. Its contents include:


 


Testing scope - what is included and what is not included in the testing of the current project 


Assumptions - what are the assumptions that are made for this project 


Milestones - major dates like when testing is going to begin, when it is planned to end, what is the trace review date, what is the production date etc. 


Resources - the resources working on this project along with their contact details 


Defect tracking mechanism - what defect tracking tool will be used, what is the SLA for fixing Critical to Low level IRs etc. 


Test management procedures - who will be notified when there is a critical IR, what reports will be sent daily, if status calls will be held daily or weekly, where will it be held, who is required to join etc. 


Work allocation - resource distribution if more projects are being tested 


Entry and exit criterion - when can a project be accepted for testing (eg. only when smoke testing passes) and when can a project be termed as testing complete (eg. when all testcases are executed and all high level bugs are fixed)

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

3 2610
Q:

Explain the concept of the Distributed systems?

Answer

Distributed systems work in a network. They can share the network resources, communicate with each other.

Report Error

View answer Workspace Report Error Discuss

0 2605
Q:

What is the value of a testing group? How do you justify your work and budget?

Answer

Testing is a process used for revealing defects in s/w and for establishing that the s/w has attained a specific degree of quality.


The s/w testing group’s main objective is to ensure that the s/w is doing what it is supposed to do as well as the s/w is not doing what it is not supposed to do. With this objective, it is clear that it is necessary to have a separate group for testing the s/w other than the group which developed it.


Also, bugs in the s/w can cause severe monetary as well as other loss to the organization. So it is important to allocate some budget for the testing group.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

1 2588
Q:

What are necessary conditions for dead lock?

Answer

1. Mutual exclusion (where at least one resource is non-sharable)


2. Hold and wait (where a process holds one resource and waits for other resource)


3. No preemption (where the resources can’t be preempted)


4. Circular wait (where p[i] is waiting for p[j] to release a resource. i= 1,2,…n


j=if (i!=n) then i+1


else 1 )

Report Error

View answer Workspace Report Error Discuss

0 2583
Q:

What does Quality factor mean?

Answer

The Quality Factor is also defined, as Q. So it is a number, which reflects the lossness of a circuit. higher the Q, the lower are the losses.


the quality factor is measurement of efficiency (or effectiveness) of a device or circuitry. In literal sense quality factor means qualitative performance of a device.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2576
Q:

Which transistor is used in each cell of EPROM?

Answer

Floating gate avalanche injection MOS (FAMOS) transistor is used in each cell of EPROM.

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware

0 2561
Q:

What is the difference between interior and exterior neighbor gateways?

Answer

Interior gateways connect LANs of one organization, whereas exterior gateways connect the organization to the outside world.

Report Error

View answer Workspace Report Error Discuss

Subject: Networking
Job Role: Network Engineer

0 2554
Q:

What is process migration?

Answer

It is the transfer of sufficient amount of the state of process from one machine to the target machine.

Report Error

View answer Workspace Report Error Discuss

0 2534