SAP MM Questions

Q:

To view the most up to date planning data (available stock, orders, reservations, etc) on a material,use the

A. Stock Requirement list.

B. Stock Overview report

C. List display of material and accounting documents

D. Standard Analysis for a material

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

12 5163
Q:

Which purchasing document(s) allow(s) only time-dependent Conditions?

A. Contract
B. Purchaseorder
C. Scheduling agreement
D. RFQ/Quotation

Answer

Answer : A


 


Explanation: Conditions in the purchase order are always  time-independent.Conditions in contracts, however, are always  time-dependent.For RFQs and scheduling agreements, you can control the time dependency with the document type.

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

9 7973
Q:

The following are lot sizing rules available for SAP R/3?

A. Replenish to maximum stock level
B. Weekly lot size
C. Daily lot size
D. Fixed lot size

Answer

Answer : A ,B ,C

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

6 5616
Q:

Which of the following master data can/must you use for pipeline meterials?

A. BOM(ascomponent)

B. Purchasing info record

C. Material master record

D. Vendor master record

E. Source list

Answer

Answer : A , B , C , D , E [all these]


 


Explanation:You must have created a material master record with a purchasing info record. To do this, you need a vendor master record. You can use the source list and BOM in connection with the pipeline material.

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

4 2798
Q:

Subject to which prerequisites can a source of supply be assigned as early as during the MRP run?

A. The 'MRP-relevant' indicator must have been set in a contract item.

B. The source determination facility must be activated at the start of the MRP run.

C. A quota arrangement must exist and the quota arrangement usage indicator must allow use of the quota arrangement in materials planning.

D. An info record must exist for the relevant material and the vendor must have been flagged in the source list as the single/sole source of supply for the purposes of materials planning.

Answer

Answer : C , D

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

4 2799
Q:

Which transaction shows the most up to date planning data?

A. Stock Requirement list

B. MRP list

C. Stock Overview report

D. List display of material and accounting documents

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

4 1721
Q:

Which of the following MRP areas do not exist?

A. Consignment MRP area
B. Plant MRP area
C. Storage location MRP area
D. Subcontractor MRP area

Answer

Answer : A

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

3 4418
Q:

Which of the following statements accurately describe a client in an SAP system?

A. A client corresponds to a customer.
B. A client has its own database.
C. A client may represent an entire company.
D. A client represents a completely independent business entity.

Answer

Answer : C , D


 


Explanation: The data for all clients in an SAP system is stored within a single common database. This data is nevertheless divided by client so that different companies can be administered and controlled in  different clients. A client is not a customer within an SAP system.


 

Report Error

View answer Workspace Report Error Discuss

Subject: SAP MM

3 3828