Exams


Q:

8 S on a SS means?

Answer

8 S on SS means 8 Sides on a Stop Sign.


This is one type of Letter Equations which are well known phrases or facts where the key words have been replaced with the first letter of that word. These are often in the form of an equation, which contain a number, an = sign and the rest of the obscured phrase or fact.


 


Some more of them are ::


90 D in a RA


26 L of the A 


12 S of the Z.

Report Error

View answer Workspace Report Error Discuss

Subject: Logic Puzzles Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

23 14415
Q:

Refer the below data table and answer the following question.

Electronics was what percent of total exports?

 

A) 19.17 percent B) 21.67 percent
C) 14.17 percent D) 16.67 percent
 
Answer & Explanation Answer: D) 16.67 percent

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Table Charts
Exam Prep: Bank Exams

0 14401
Q:

Arrange the following in descending order.

 

54, 43 and 64

 

 

A) 1 B) 2
C) 3 D) 4
 
Answer & Explanation Answer: D) 4

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: Bank Exams

1 14401
Q:

Two trains are moving in the same direction at 72 kmph and 36 kmph. The faster train crosses a girl sitting at window seat in the slower train in 32 seconds. Find the length of the faster train ?

A) 170 m B) 100 m
C) 270 m D) 320 m
 
Answer & Explanation Answer: D) 320 m

Explanation:

Relative speed = (72 - 36) x 5/18 = 2 x 5 = 10 mps.
Distance covered in 32 sec = 32 x 10 = 320 m.

The length of the faster train = 320 m.

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

11 14400
Q:

Time taken by P alone to finish a work is 50% more than the time taken by P and Q together. Q is thrice as efficient as R. If Q and R together can complete the work in 22.5 days, then how many days will P alone take to complete the work ?

A) 17 days B) 11 days
C) 15 days D) 16 days
 
Answer & Explanation Answer: C) 15 days

Explanation:

We know that Time is inversely proportional to Efficiency

Here given time ratio of P & P+Q as

P/P+Q = 150/100 = 3:2

Efficiency ratio of P & Q as

P:Q = 2:1 ....(1)

Given Efficiency ratio of Q & R as

Q:R = 3:1 ....(2)

From (1) & (2), we get

P:Q:R = 6:3:1

P alone can finish the work in

22.5(3+1)/6 = 15 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

18 14397
Q:

In a cricket match, five batsmen P, Q, R, S and T scored an average of 36 runs. S Scored 5 more than T; T scored 8 fewer than P; Q scored as many as S and T combined; and Q and R scored 107 between them. How many runs did T score ?

A) 20 B) 29
C) 28 D) 24
 
Answer & Explanation Answer: A) 20

Explanation:

Let the runs scored by P, Q, R, S and T be  a, b, c, d and e

From given data,

a + b + c + d + e = 36 x 5 = 180
b + c = 107
Let a = x
e = x-8
d = x-3
now 3x - 11 + 107 = 180
3x = 84
x = 28
e's score = 28-8 = 20

Report Error

View Answer Report Error Discuss

Filed Under: Mathematical Operations
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

40 14384
Q:

There are four prime numbers written in ascending order of magnitude. The product of the first three is 385 and of the last three is 1001. Find the fourth number ?

A) 17 B) 19
C) 13 D) 11
 
Answer & Explanation Answer: C) 13

Explanation:

(385/1001) = 5/13

First Number is 5

=> Fourth number is 13 

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

14 14382
Q:

A sector of 120 degrees, cut out from a circle, has an area of 66/7 sq cm. Find the radius of the circle.

A) 1cm B) 2cm
C) 3cm D) 4cm
 
Answer & Explanation Answer: C) 3cm

Explanation:

πr=667

 r =3

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

13 14377