CAT Questions

Q:

Arakan yoma is the extension of the himalayas located in

A) Myanmar B) West Bengal
C) Nagaland D) Baluchistan
 
Answer & Explanation Answer: A) Myanmar

Explanation:

Arakan yoma is the extension of the himalayas located in Myanmar. The Arakan Mountains are also known as the Rakhine Mountains.

 

Arakan_yoma_is_the_extension_of_the_himalayas_located_in1558508556.jpg image 

 

These are a mountain range in western Myanmar, between the coast of Rakhine State and the Central Myanmar Basin, in which the Irrawaddy River flows.

 

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

11 21847
Q:

It takes five minutes to pass a rumour from one person to two other persons. The tree of rumour continues. Find how many minutes does it take spread the rumour to 729 persons ?

A) 45 min B) 25 min
C) 30 min D) 36 min
 
Answer & Explanation Answer: C) 30 min

Explanation:

After 5 mins ..... 3 persons will get rumour
After 10 mins .... 3x2 + 3 = 9 = 32 persons will get
after 15 =5x3 min ......9x2 + 9 =27 = 33 persons will get news.
.
.
after 5x6 mins ... 36 = 729 persons will get news.

 

Therefore, time taken to spread the rumour to 729 persons is 30 minutes.

Report Error

View Answer Report Error Discuss

Filed Under: Arithmetical Reasoning
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

23 21835
Q:

P is 30% more efficient than Q. How much time will they, working together, take to complete a job which P alone could have done in 23 days?

A) 16 days B) 13 days
C) 15 days D) 12 days
 
Answer & Explanation Answer: B) 13 days

Explanation:

Ratio of times taken by P & Q = 100 : 130 = 10:13

 

Let Q takes x days to do the work

Then, 10:13 :: 23:x

=> x = 23x13/10

=> x = 299/10

 

P's 1 day's work = 1/23

Q's 1 day's work = 10/299

(P+Q)'s 1 day's work = (1/23 + 10/299) = 23/299 = 1/13

Hence, P & Q together can complete the work in 13 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

17 21828
Q:

Rain drops acquire spherical shape due to 

A) viscosity B) surface tension
C) friction D) elasticity
 
Answer & Explanation Answer: B) surface tension

Explanation:

The Surface tension pulls the surface of the drop equally at all points thus produces the spherical shape having the minimum surface area. This surface tension is the "skin" of a body of water that makes the molecules stick together.

                                 Rain_drops_acquire_spherical_shape_due_to1558074071.png image 

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

123 21826
Q:

Square is to Triangle and Cube is to

A) Pyramid B) Rectangle
C) Ice D) Rhombus
 
Answer & Explanation Answer: A) Pyramid

Explanation:

Square is 2-dimensional 4 sided figure Whereas Cube is 3-dimensional figure which looks like Square.

 

Similarly, Triangle is 2-dimensional 3 sided figure Whereas Pyramid is 3-dimensional figure which looks like Triangle.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

14 21784
Q:

A polygon has 44 diagonals, then the number of its sides are ?

A) 13 B) 9
C) 11 D) 7
 
Answer & Explanation Answer: C) 11

Explanation:

Let the number of sides be n. 

The number of diagonals is given by nC2 - n  

Therefore, nC2 - n = 44, n>0 

nC2 - n = 44

n- 3n - 88 = 0 

n2 -11n + 8n - 88 = 0  

n(n - 11) + 8(n - 11) = 0 

n = -8 or n = 11.

 

As n>0, n will not be -8. Therefore, n=11.

Report Error

View Answer Report Error Discuss

Filed Under: Permutations and Combinations
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

25 21768
Q:

P and Q can complete a job in 24 days working together. P alone can complete it in 32 days. Both of them worked together for 8 days and then P left. The number of days Q will take to complete the remaining work is ?

A) 56 days B) 54 days
C) 60 days D) 64 days
 
Answer & Explanation Answer: D) 64 days

Explanation:

(P+Q)'s 1 day work = 1/24

P's 1 day work = 1/32

=> Q's 1 day work = 1/24 - 1/32 = 1/96

Work done by (P+Q) in 8 days = 8/24 = 1/3

Remainining work = 1 - 1/3 = 2/3

Time taken by Q to complete the remaining work = 2/3 x 96 = 64 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO

22 21749
Q:

If the selling price of a mat is five times the discount offered and if the percentage of discount is equal to the percentage profit, find the ratio of the discount offered to the cost price.

A) 6:31 B) 11:30
C) 7:30 D) 31:6
 
Answer & Explanation Answer: C) 7:30

Explanation:

Since S.P. = 5 (M.P. - S.P.) => 5 M.P. = 6 S.P.
M.P. = (6/5) S.P.
Since the percentage discount = Percentage profit,
65S.P - S.P65S.P×100 = S.P -C.PC.P×100
Therefore, 1/6 = (S.P/C.P) – 1 => S.P = (7/6) C.P
M.P = 6/5 S.P = 6/5 x 7/6 C.P = 7/5 C.P
Therefore, Ratio of discount to C.P
= (M.P – S.P)/C.P = [{(7/5)C.P - (7/6)C.P} / C.P.]
= 7/30

 

Therefore, the ratio is 7 : 30

Report Error

View Answer Report Error Discuss

Filed Under: Profit and Loss
Exam Prep: GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk , Analyst

32 21707