Bank Exams Questions

Q:

2 metres broad pathway is to be constructed around a rectangular plot on the inside. The area of the plots is 96 sq.m. The rate of construction is Rs. 50 per square metre. Find the total cost of the construction?

A) 20 B) 30
C) 40 D) data is inadequate
 
Answer & Explanation Answer: D) data is inadequate

Explanation:

Given lb =96

Area of pathway = [(l-4)(b-4)-lb] = 16-4(l+b)

Which cannot be determined. so, data is inadequate.

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

7 15605
Q:

Refer the below data table and answer the following question.

What percent students who chose engineering are girls?

A) 20 B) 10.42
C) 50 D) 25
 
Answer & Explanation Answer: A) 20

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Table Charts
Exam Prep: Bank Exams

0 15604
Q:

Which unit holds data temporarily?

A) Secondary storage unit B) Output Unit
C) Primary Memory Unit D) Input unit
 
Answer & Explanation Answer: C) Primary Memory Unit

Explanation:

Memory is the part of the computer that temporarily holds data and instructions before and after they are processed by the ALU.

 

Memory is also known as primary storage, primary memory, main storage, internal storage, and main memory.

 

Manufacturers often use the term RAM, which stands for random-access memory.​

Report Error

View Answer Report Error Discuss

23 15600
Q:

The KeyPress event will capture pressing the key

A) control. B) A.
C) Both a and b. D) shift.
 
Answer & Explanation Answer: B) A.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: Bank Exams

10 15569
Q:

Twelve children take sixteen days to complete a work which can be completed by 8 adults in 12 days. After working for 3 days, sixteen adults left and six adults and four children joined them. How many days will they take to complete the remaining work ?

A) 3 days B) 2 days
C) 6 days D) 12 days
 
Answer & Explanation Answer: C) 6 days

Explanation:

From the given data,

12 children 16 days work,
One child’s one day work = 1/192.


8 adults 12 days work,
One adult’s one day’s work = 1/96.


Work done in 3 days = ((1/96) x 16 x 3) = 1/2


Remaining work = 1 – 1/2 = 1/2


(6 adults+ 4 children)’s 1 day’s work = 6/96 + 4/192 = 1/12

1/12 work is done by them in 1 day.

1/2 work is done by them in 12 x (1/2) = 6 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: TOEFL , GRE , GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

11 15567
Q:

A girl facing north rotates 100(degree) clockwise then 190(degree) anticlockwise. what is new direction of the girl ?

A) North-East B) West
C) South-East D) South
 
Answer & Explanation Answer: B) West

Explanation:

First girl facing North
Then she rotates 100 deg clock wise => 10 deg ES
Then again she rotates 190 deg anti clock wise => for 100 deg it is North and more 90 deg means West.
Therefore, the new direction of the girl is West.

Report Error

View Answer Report Error Discuss

Filed Under: Direction Sense Test
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO

52 15560
Q:

Refer the below data and answer the following question.

Who has the least weight to height ratio?

 

A) Ashu B) Aslam
C) Ayush D) Ayushman
 
Answer & Explanation Answer: D) Ayushman

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Table Charts
Exam Prep: Bank Exams

0 15553
Q:

Two trains, one from Hyderabd to Bangalore and the other from Bangalore to Hyderabad, start simultaneously. After they meet, the trains reach their destinations after 9 hours and 16 hours respectively. The ratio of their speeds is  ?

A) 3 : 4 B) 4 : 3
C) 2 : 3 D) 3 : 2
 
Answer & Explanation Answer: B) 4 : 3

Explanation:

Let us name the trains as A and B.

Then, (A's speed) : (B's speed)

= √b : √a = √16 : √9 = 4:3

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Trains
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

5 15551