GATE Questions

Q:

The Value of  logtan10+logtan20++logtan890 is

A) -1 B) 0
C) 1/2 D) 1
 
Answer & Explanation Answer: B) 0

Explanation:

= log tan10+log tan890 + log tan20+ log tan880++log tan450  

 

= log [tan10 × tan890] + log [tan20 × tan880 ] ++log1  

 

 tan(90-θ)=cotθ and tan 450=1  

 

= log 1 + log 1 +.....+log 1 

 

= 0.

Report Error

View Answer Report Error Discuss

Filed Under: Logarithms
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

27 7260
Q:

A sold an article to B at 40% profit and B sold it to C at 50% profit, then what will be profit percent with respect to A ?

A) 97 % B) 110 %
C) 135 % D) 115 %
 
Answer & Explanation Answer: B) 110 %

Explanation:

% Profit with respect to A = 40 + 50 + (40 x 50)/100 = 90 + 20 = 110 %.

Report Error

View Answer Report Error Discuss

Filed Under: Profit and Loss
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

2 7253
Q:

Can you slove this Maths Puzzle?

maths_puzzle1537500715.jpg image

A) 12 B) 6
C) 3 D) 1
 
Answer & Explanation Answer: B) 6

Explanation:

In the given puzzle, the logic behind is

9 = 72 => 9 x 8 = 72

8 = 56 => 8 x 7 = 56

7 = 42 => 7 x 6 = 42

6 = 30 => 6 x 5 = 30

5 = 20 => 5 x 4 = 20

 

Similarly,

4 = 12 => 4 x 3 = 12

3 = 6 => 3 x 2 = 6

Report Error

View Answer Report Error Discuss

Filed Under: Math Puzzles
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank Clerk , Bank PO

19 7252
Q:

A duster is of dimension 5x5x7 all in cms,  is sinked into a cylindrical vessel of radius 5 cm and height 10 cm. After insertion the level of the water is inccresed by 2.14 cm. Then by what percentage the part of the duster is above the layer ?

A) 96 % B) 4 %
C) 97 % D) 3 %
 
Answer & Explanation Answer: B) 4 %

Explanation:

Imension of the duster is assumed as 5x5x7 cm3

Volume of the duster below the water layer
= volume of water increased
= πxrxrxh = 3.14×52×2.14 ≈ 168 cm3

Total volume of the duster = 5×5×7 = 175 cm3

Percentage of the duster part below the layer = 168×100/175 = 96%

Percentage of the duster part above the layer = 4%

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

4 7251
Q:

A merchant commences with a certain capital and gains annually at the rate of 30 per cent. At the end of 2 years he has worth Rs 10,000. What was the original capital? 

A) Rs. 4987 B) Rs. 5148
C) Rs. 5917 D) Rs. 6254
 
Answer & Explanation Answer: C) Rs. 5917

Explanation:

Let the Original capital amount be Rs. P

Given after 2 years the amount is Rs. 10000

Rate of interest = 30%

According to the question,

P x 130100 x 130100 = 10000=> P = 1000000169 = 5917

Therefore, the capital amount P = Rs. 5917

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

6 7243
Q:

What is always coming but never arrives?

Answer

It is Tomorrow. It always be tomorrow which represents coming but never arrives.

Report Error

View answer Workspace Report Error Discuss

7 7237
Q:

In which atmospheric layer are the communication satellites located?

A) Thermosphere B) Troposphere
C) Mesosphere D) Stratosphere
 
Answer & Explanation Answer: A) Thermosphere

Explanation:

In terms of the Earth's atmosphere, they occupy regions called the thermosphere and the exosphere. The layer through which a satellite orbits depends on the satellite's function and the kind of orbit it has.

 

The thermosphere is a region of very high temperature that extends from the top of the mesosphere at around 85 kilometers (53 miles) up to 640 kilometers (400 miles) above the Earth's surface. It is called the thermosphere because temperatures can reach up to 1,500 degrees Celsius (2,732 degrees Fahrenheit).

 

However, despite the high temperatures, the pressure is very low, so satellites don't suffer heat damage.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , IT Trainer

8 7234
Q:

Adam and Smith are working on a project. Adam takes 6 hrs to type 36 pages on a computer, while Smith takes 5 hrs to type 40 pages. How much time will they take, working together on two different computers to type a project of 120 pages?

A) 8 hrs 45 min B) 8 hrs 42 min
C) 8 hrs D) 8 hrs 34 min
 
Answer & Explanation Answer: D) 8 hrs 34 min

Explanation:

Number of pages typed by Adam in 1 hour = 36/6 = 6
Number of pages typed by Smith in 1 hour = 40/5 = 8
Number of pages typed by both in 1 hour = (6 + 8) = 14
Time taken by both to type 110 pages = (120 * 1/14) = 847 = 8 hrs 34 min.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: GATE , CAT , Bank Exams
Job Role: Bank PO , Bank Clerk

10 7233