Searching for "and"

Q:

You are a sincere and dedicated manager in a reputed five-star hotel. You have been appointed as the Chief Manager of the Guwahati branch which needs to be developed.Your Salary has been hiked.

A) You give it a shot for 2 months and see how it goes B) You accept the challenge and go ahead with the project
C) You accept another offer and leave the job D) You crib for limited resources and try to convince the superior to send somebody else instead of yoiu
 
Answer & Explanation Answer: B) You accept the challenge and go ahead with the project

Explanation:
Report Error

View Answer Report Error Discuss

Q:

If you find yourself in a situation where you are required to make a power - point presentation and you are already bogged down by too much work, as the manager what would you do?

A) Take an alternative mode of presentation B) Cancel the seminar and reschedule according to your convenience
C) Pass the buck to your subordinate, you are the boss, no one can question you D) Prioritise your work and try to squeeze out time for it
 
Answer & Explanation Answer: D) Prioritise your work and try to squeeze out time for it

Explanation:

A manager is one who has the expertise to manage tasks properly.So, it becomes his prime responsibility to rearrange his work schedule properly and work out the required time for the project rather than postpone it or hand it over to some one else.

Report Error

View Answer Report Error Discuss

Q:

A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed?

A) 11 days B) 12 days
C) 13 days D) 14 days
 
Answer & Explanation Answer: A) 11 days

Explanation:

One day's work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.

C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.

Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.

Remaining Work = 7/10, which was done by A,B and C in the initial number of days. 

Number of days required for this initial work = 7 days. 

Thus, the total numbers of days required = 4 + 7 = 11 days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work

Q:

A and B can do a work in 4 hours and 12 hours respectively. A starts the work at 6 AM and they work alternately for one hour each. When will the work be completed?

A) 4 days B) 5 days
C) 6 days D) 7 days
 
Answer & Explanation Answer: C) 6 days

Explanation:

Work donee by A and B in the first two hours, working alternatively = First hour A + Second hour B = (1/4) + (1/12) = 1/3.

Thus, the total time required to complete the work  = 2 (3) = 6 days 

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work

Q:

A drink vendor has 80 liters of Mazza, 144 liters of Pepsi, and 368 liters of Sprite. He wants to pack them in cans, so that each can contains the same number of liters of a drink, and doesn't want to mix any two drinks in a can. What is the least number of cans required?

A) 35 B) 36
C) 37 D) 38
 
Answer & Explanation Answer: C) 37

Explanation:

If we want to pack the drinks in the least number of cans possible, then each can should contain the maximum numbers of liters possible.As each can contains the same number liters of a drink, the number of liters in each can is a comman factor for 80,144 and 368; and it is also the highest such factor, as we need to store the maximum number of liters in each can.

So, the number of liters in each can  = HCF of 80,144 and 368 = 16 liters.

Now, number of cans of Maaza = 80/16 = 5

Number of cans of Pepsi = 144/16 = 9

Number of cans of Sprite = 368/16 = 23

Thus, the total number of cans required = 5 + 9 + 23 = 37 

Report Error

View Answer Report Error Discuss

Filed Under: HCF and LCM

Q:

A room is 6 meters 24 centimeters in length and 4 meters 32 centimeters in Width. Find the least number of square tiles of equal size required to cover the entire floor of the room.

A) 107 B) 117
C) 127 D) 137
 
Answer & Explanation Answer: B) 117

Explanation:

Let us calculate both the length and width of the room in centimeters.

Length = 6 meters and 24 centimeters = 624 cm

width = 4 meters and 32 centimeters = 432 cm

As we want the least number of square tiles required, it means the length of each square tile should be as large as possible.Further,the length of each square tile should be a factor of both the length and width of the room.

Hence, the length of each square tile will be equal to the HCF of the length and width of the room = HCF of 624 and 432 = 48

Thus, the number of square tiles required = (624 x 432 ) / (48 x 48) = 13 x 9 = 117

Report Error

View Answer Report Error Discuss

Filed Under: HCF and LCM

Q:

A can give B 100 meters start and C 200 meters start in a kilometer race. How much start can B give C in a kilometer race?

A) 110.12 meters B) 111.12 meters
C) 112.12 meters D) 113.12 meters
 
Answer & Explanation Answer: B) 111.12 meters

Explanation:

A runs 1000 meters while B runs 900 meters and C runs 800 meters.

Therefore, B runs 900 meters while C runs 800 meters.

So, the number of meters that C runs when B runs 1000 meters = (1000 x 800)/900 = 8000/9 = 888.88 meters

Thus, B can give C (1000 - 888.88) = 111.12 meters start

Report Error

View Answer Report Error Discuss

Filed Under: Races and Games

Q:

If 12 men can reap 120 acres of land in 36 days, how many acres of land can 54 men reap in 54 days?

A) 710 acres B) 760 acres
C) 810 acres D) 860 acres
 
Answer & Explanation Answer: C) 810 acres

Explanation:

12 men120 acres36 days54 men?54 days

 As 12 men can reap 120 acres, 54 men will be able to reap more acres in 36 days, 120 acres of land was reaped, so in 54 days, more land will be reaped.

 

Thus, the numbers of acres that can be reaped by 54 men in 54 days = 5412x120x5436 = 810 acres

Report Error

View Answer Report Error Discuss

Filed Under: Ratios and Proportions
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk , Bank PO