Q:

A train overtakes two girls who are walking in the  opposite direction in which the train  is going at the rate of 3 km/h and 6km/h and passes them completely in 36 seconds and 30 seconds respectively. The length of the train is:

A) 120m B) 150m
C) 125m D) None of these
 
Answer & Explanation Answer: B) 150m

Explanation:

Let the length of the train e x meter, and let the speed of train be y km/h, then

x=y+3×518×36   --------(1)   and   

x=y+6×518×30  ---------(2)

  

From eq (1) and (2), we get      

y = 12 km/h

Therefore,  x=(y+3)×518×36   =>  x= 150 m

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance

Q:

A person goes to his office at 1/3rd of the speed at which he returns from his office. If the average speed during the whole trip is 12 m /h . what is the speed of the person while he was going to his office?

A) 10 B) 6
C) 8 D) can't be determined
 
Answer & Explanation Answer: C) 8

Explanation:

u = k , v= 3k 

 

2uvu+v 2×k×3kk+3k=12  => k = 8km/h

Report Error

View Answer Report Error Discuss

Filed Under: Time and Distance

Q:

A contractor  undertook a project to complete it in 20 days which needed 5 workers to work continuously for all the days estimated. But before the start of the work the client wanted to complete it earlier than the scheduled time, so the contractor calculated that  he needed to increase 5 additional  men every 2 days to complete the work in the time the client wanted it:

If the work was further increased by 50% but the contractor continues to increase the 5 workers o every 2 days then how many more days are required over the initial time specified by the  client.

A) 1 day B) 2 days
C) 5 days D) None of these
 
Answer & Explanation Answer: B) 2 days

Explanation:

Total work = 100+50 = 150man-days

In 8 days 100 man-days work  has been completed. Now on 9th and 10th day there will be 25 workers. So in 2 days they wll complete additional 50 man- days work. Thus the work requires 2 more days.

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work

Q:

A tank has an inlet and outlet pipe. The inlet pipe fills the tank completely in 2 hours when the outlet pipe is plugged. The outlet pipe empties the tank completely in 6 hours when the inlet pipe is pluggeed.

If there is a lekage also which is capable of draining out the liquid from the tank at half of the  rate of outet pipe,them what is the time taken to fill the emty tank when both the pipes are opened?

A) 3 hours B) 4 hours
C) 5 hours D) None of these
 
Answer & Explanation Answer: B) 4 hours

Explanation:

Rate of leakage = 8.33% per hour

Net efficiency = 50 - (16.66 + 8.33)= 25%

Time required = 100/25 = 4 hours

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work

Q:

Concept of Nehative Work

A tub can be filed in 20 minutes but there is a lekage in it which can empty the full tub in 60 minutes. In how many minutes it can be filled?

Answer

Filling efficiency = 5%        


Emptying efficiency = 1.66%  


Net efficiency = 5-1.66 = 3.33%


Therefore, Required time to fil the tub =100/3.33= 30 minutes

Report Error

View answer Workspace Report Error Discuss

Subject: Time and Work

Q:

From a tank of petrol , which contains 200 liters of petrol, the seller replaces each time with kerosene when he sells 40 liters of petrol(or mixture). Everytime he sells out only 40 liters of petrol (pure or impure). After replacing the petrol with kerosene 4th time, the total amount of kerosene in the mixture is

A) 81.92L B) 96L
C) 118.08L D) None of these
 
Answer & Explanation Answer: C) 118.08L

Explanation:

The amount of petrol left after 4 operations = 200×1-402004=81.92 

 

Hence the amount of kerosene = 200 - 81.92 = 118.08 liters

Report Error

View Answer Report Error Discuss

Filed Under: Alligation or Mixture

Q:

A milk man has 20 liters of milk. If he mixes 5 liters of water, which is freely available, in 20 liters of pure milk.If the cost of pure milk is Rs.18 per liter,then the profit of the milkman, when he sells all the mixture at cost price is:

A) 20% B) 25%
C) 33.33% D) 18%
 
Answer & Explanation Answer: B) 25%

Explanation:

when the water is freely available and all the water is sold at the price of the milk, then the water gives the profit on the cost of 20 liters of milk.

 Therefore, profit percentage = (5/20) x 100 =25 %       [ Profit %= (Profit/C.P)*100]

Report Error

View Answer Report Error Discuss

Filed Under: Profit and Loss

Q:

Tell us about a situation in which you had to adjust to changes over which you had no control. How did you handle it?

Answer

Strategy Statement: 


The interviewer is interested in knowing how you are able to perform in a workplace where you are not the one who is ‘making the calls’. The typical workplace environment involves a tiered structure where there are those who make the decisions and those who perform the work. An entry level position most often assumes the role of the latter. 


Sample Response: 


I am a performer of tasks. As a new employee, I understand that many of my duties will be directed by those above me. These will undoubtedly involve changes, and as long as I understand how the changes are related to the betterment of the company/business/corporation, I am fully ‘on board’. I once worked for a corporation where one of my duties was to prepare the annual report. As a result of input from the overseeing board and members, the format for that report was changed significantly. Although this meant that I had to relearn the report-writing process, with my understanding that this change would mean that the report was more accessible and easy to read, I had no problem with the demands of that change.

Report Error

View answer Workspace Report Error Discuss

Subject: Adaptability