Q:

Describe how to perform Risk Analysis during software testing.

Answer

While a test plan is being created, risks involved in testing the product are to be taken into consideration along with possibility of their occurrence and the damage they may cause along with solutions; if any. Detailed study of this is called as Risk Analysis.


Some of the risks could be:


New Hardware 


New Technology 


New Automation Tool 


Sequence of code delivery 


Availability of application test resources 


Identify and describe the risk magnitude indicators: High, Medium and Low


High magnitude means the effect of the risk would be very high and non-tolerable. Company may face severe loss and its reputation is at risk. Must be tested.


Medium: tolerable but not desirable. Company may suffer financially but there is limited liability or loss of reputation. Should be tested.


Low: tolerable. Little or no external exposure. Little or no financial loss. Company’s reputation unaffected. Might be tested.


Three perspectives of Risk Assessment: Effect, Cause and Likelihood.


To assess risk by Effect, identify a condition, event or action and try to determine its impact.


To asses risk by Cause is opposite of by Effect. Begin by stating an undesirable event or condition and identify the set of events that could have permitted the condition to exist.


To asses risk by Likelihood is to determine the probability that a requirement will not be satisfied.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

Sould the railways in india be privatised in a phased manner like other public sector enterprises? 

Arguments:

1. Yes. This is the only way to bring in competativeness and provide better services

2. No. It leads to wastage of resources

A) Only 1 is true B) Only 2 is true
C) Either 1 or 2 is true D) Neither 1 nor 2 is true
 
Answer & Explanation Answer: D) Neither 1 nor 2 is true

Explanation:

Privatization would no doubt lead to better services.But saying that 'this is the only ' is wrong

Report Error

View Answer Report Error Discuss

Q:

What's the role of CMM Level in Testing?

Answer

Capability Maturity Model (CMM) is a model of 5 levels of process 'maturity' that determine effectiveness in delivering quality software. The 5 levels of CMM are described as below:


Level 1: Initial: - characterized by chaos, periodic panics, and heroic efforts required by individuals to successfully complete projects. Very few or none of the processes are in place.


Level 2: Repeatable: - Software Project Tracking, Requirements Management, Realistic Planning and Configuration Management Processes are in place; successful practices can be repeated.


Level 3: Defined: - Standard Software Development and Maintenance Processes are integrated throughout an organization. A Software Engineering Process Group is in place to oversee software processes, and training programs are used to ensure understanding and compliance.


Level 4: Managed: - Metrics are used to track productivity, processes, and products. Project performance is predictable, and quality is consistently high.


Level 5: Optimizing: - The focus is on continuous process improvement. The impact of new processes and technologies can be predicted and effectively implemented when required.


Any organization can start from any level, but its motto is to reach level 5; where the focus is continuous process improvement. By doing this, high quality s/w delivery is assured.


From this, we can see that the whole essence of CMM or CMMI is to produce quality software. It targets the whole organizational practices (or processes), which are believed to be the best across industries. Testing is part of Quality Assurance. CMM levels play an important role in an organization’s Quality Assurance effort. Thus testing plays an important role in determining CMM level.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

What is the difference in writing the test cases for Integration testing and system testing?

Answer

Integration testing is done at module level when various modules are integrated with each other to form a system or sub-system. Its main purpose is to ensure that interfaces between various modules are working properly; i.e. modules which are working individually are also working correctly together.


System testing is done on a complete, integrated system to evaluate the system’s compliance with its specified requirements. It validates that the system meets its functional and non-functional requirements.


From these definitions, it is clear that the purpose of Integration and purpose of System Testing are different. Therefore, Integration test cases focus more on the interfaces between modules (interface integrity) - the data transfer and their interaction with each other. System test cases focus on testing the product as a whole; i.e. whether the functional, non-functional requirements of the System are met or not. Since System Testing is the final phase before delivery of the product, System test cases should pinpoint configuration related errors along with testing for performance, security, reliability etc.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

What are the roles of glass-box and black-box testing tools?

Answer

Glass Box (or white box) testing is the process of giving i/p to the system and checking how the system processes i/p to generate o/p


Black Box testing is the process of giving i/p to the system and checking if the system is giving correct o/p without bothering how the o/p is generated.


As we can see from the definitions, the role of black box testing is to ensure that the o/p generated is correct. And role of white box testing is to ensure that methods used to generate the o/p are correct.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

What are the key challenges of software testing?

Answer

Key Challenges of s/w testing:


1. Testing considered late in project


2. Requirements not testable


3. Integration is done after all components have been developed: This might result into full testing not being covered.


4. Complete testing is not possible

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

What is the value of a testing group? How do you justify your work and budget?

Answer

Testing is a process used for revealing defects in s/w and for establishing that the s/w has attained a specific degree of quality.


The s/w testing group’s main objective is to ensure that the s/w is doing what it is supposed to do as well as the s/w is not doing what it is not supposed to do. With this objective, it is clear that it is necessary to have a separate group for testing the s/w other than the group which developed it.


Also, bugs in the s/w can cause severe monetary as well as other loss to the organization. So it is important to allocate some budget for the testing group.

Report Error

View answer Workspace Report Error Discuss

Subject: Software Testing

Q:

What are the best way to prevent a computer virus from entering your computer?

Answer

1.Logout of your computer each time you have finished using it


2.Install and use anti-virus software on your computer 


3.Do not use emails on your machine


4.Make sure all your files are safely stored to your floppy disks

Report Error

View answer Workspace Report Error Discuss

Subject: Hardware