Quantitative Aptitude - Arithmetic Ability Questions

Q:

25 divided by15.

 

A) 1125 B) 5
C) 25 D) 125
 
Answer & Explanation Answer: D) 125

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: Bank Exams

0 20633
Q:

If 4/7 of P is equal to 12/14 of Q, then what is P : Q?

 

A) 15 : 8   B) 14 : 9  
C) 7 : 8   D) 3 : 2
 
Answer & Explanation Answer: D) 3 : 2

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Ratios and Proportions
Exam Prep: Bank Exams

2 20559
Q:

Two dice are thrown simultaneously. What is the probability of getting two numbers whose product is even?

A) 3/4 B) 3/8
C) 5/16 D) 2/7
 
Answer & Explanation Answer: A) 3/4

Explanation:

In a simultaneous throw of two dice, we have n(S) = (6 x 6) = 36.

Then, E= {(1, 2), (1, 4), (1, 6), (2, 1), (2, 2), (2, 3), (2, 4), (2, 5), (2, 6), (3, 2), (3,4),(3, 6), (4, 1), (4, 2), (4, 3), (4, 4), (4, 5), (4, 6), (5, 2), (5, 4), (5, 6), (6, 1),6, 2), (6, 3), (6, 4), (6, 5), (6, 6)}

n(E) = 27.

P(E) = n(E)/n(S) = 27/36 = 3/4.

Report Error

View Answer Report Error Discuss

Filed Under: Probability

44 20552
Q:

How many window coverings are necessary to span 50 windows, if each window covering is 15 windows long?

A) 4 B) 15
C) 3 D) 50
 
Answer & Explanation Answer: A) 4

Explanation:

Given that, 

Number of windows = 50

Each window covering covers 15 windows

=> 50 windows requires 50/15 window coverings

= 50/15 = 3.333

 

Hence, more than 3 window coverings are required. In the options 4 is more than 3. 

 

Hence, 4 window coverings are required to cover 50 windows of each covering covers 15 windows.

Report Error

View Answer Report Error Discuss

Filed Under: Average
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO , Database Administration , IT Trainer

13 20496
Q:

A man runs round a circular field of radius 50m at the speed of 12 km/hr. What is the time taken by the man to take twenty rounds of the field?

A) 220/7 min B) 110/7 min
C) 90/7 min D) 230/7 min
 
Answer & Explanation Answer: A) 220/7 min

Explanation:

speed = 12 km/h = 12×518=103m/s 

 

distance covered = 20×2×227×50=440007m 

 

time taken  = distance /speed =  440007×310sec=4400×37×160min=2207min 

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

31 20454
Q:

1595 is the sum of the square of three consecutive odd numbers. Find the numbers.

 

A) 19, 21, 23 B) 17, 19, 21
C) 21, 23, 25 D) 23, 25, 27
 
Answer & Explanation Answer: C) 21, 23, 25

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Problems on Numbers
Exam Prep: Bank Exams

3 20305
Q:

A can do a piece of work in 30 days. He works at it for 6 days and then B finishes it in 18 days. In what time can A and B together it ?

A) 14 1/2 days B) 11 days
C) 13 1/4 days D) 12 6/7 days
 
Answer & Explanation Answer: D) 12 6/7 days

Explanation:

Let 'B' alone can do the work in 'x' days

6/30 + 18/x = 1

=> x = 22.5

 

1/30 + 1/22.5 = 7/90 

=> 90/7 = 12 6/7 days

Report Error

View Answer Report Error Discuss

Filed Under: Time and Work
Exam Prep: CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

29 20201
Q:

The breadth of a rectangular field is 60% of its length. If the perimeter of the field is 800 m.What is the area of the field?

A) 47500 B) 37500
C) 57500 D) 77500
 
Answer & Explanation Answer: B) 37500

Explanation:

Let length = x meters, then breadth = 0.6x 

Given that  perimeter = 800 meters 

=> 2[ x + 0.6x] = 800 

=> x = 250 m 

Length = 250m and breadth = 0.6 x  250 = 150m 

Area = 250 x 150 = 37500 sq.m

Report Error

View Answer Report Error Discuss

Filed Under: Area
Exam Prep: Bank Exams
Job Role: Bank PO

19 20196