Questions

Q:

In the following question, a sentence has been given in Active/Passive voice. Out of the four alternatives suggested, select the one which best expresses the same sentence in Passive/Active voice.

The director will give you instructions.

A) Instructions shall be given to you by the director. B) You will get instructions from the director.
C) You shall get instructions from the director. D) Instructions will be given to you by the director.
 
Answer & Explanation Answer: D) Instructions will be given to you by the director.

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2238
Q:

Project Quality Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Perform Quality Control?

Answer

I. Inputs



  • Quality management plan

  • Quality metrics 

  • Quality checklists

  • Organizational process assets

  • Work performance information

  • Approved change requests

  • Deliverables


II. Tools and Techniques



  • Cause and effect diagram

  • Control charts

  • Flow Charting

  • Histogram

  • Pareto chart

  • Run chart

  • Scatter diagram

  • Statistical sampling

  • Inspection

  • Defect repair review


III. Outputs



  • Quality control measurements

  • Validated defect repair

  • Quality baseline (updates)

  • Recommended corrective actions

  • Recommended preventive actions

  • Requested changes

  • Recommended defect repair

  • Organization process assets (updates)

  • Validated deliverables

  • Project management plan (updates)


 


 

Report Error

View answer Workspace Report Error Discuss

0 2238
Q:

Crystal size in igneous rocks is determined by

Answer

Crystal size in igneous rocks is determined by rate of cooling i.e, the time taken by magma to cool down. 


 Crystal_size_in_igneous_rocks_is_determined_by1554209716.jpg image


 


Hence, the slower the rate of cooling the larger the crystals. The faster the rate of cooling the smaller the crystals.

Report Error

View answer Workspace Report Error Discuss

Subject: General Science Exam Prep: Bank Exams , AIEEE
Job Role: Bank Clerk , Analyst

1 2238
Q:

Which Indian state produces the maximum wind energy?

A) Himachal Pradesh B) Tamil Nadu
C) Karnataka D) Maharashtra
 
Answer & Explanation Answer: B) Tamil Nadu

Explanation:

Tamilnadu produces the maximum wind energy of 7269Mw.


Then Maharashtra(4100MW)

-->Gujrat (3454MW)

--> Rajasthan (2784MW)

-->Then in line karnataka, Andhra Pradesh, Madhya Pradesh.

Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2238
Q:

What is the best way to prevent pest infestation?

Answer

Pest infestation is nothing but the presence of large number of pests at a place, typically so as to cause damage or disease.


 


Climatic conditions affect a considerable number of pests. Some are more active during warmer periods than others. As these summer insects invade your home, they're likely in search of food, water, shelter, or have encountered an entrance. To pest-proof your home this summer, it's best to remove their 'WHY’ or reason for entering your home.


* Keep your place clean and dry. Make sure there is no food laying about.


* Removing food residue - food is a common attraction to a number of different pests.


* Regular disinfection of the surfaces.

Report Error

View answer Workspace Report Error Discuss

Subject: General Science Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

1 2237
Q:

The Indian Institute of Science is located at

A) Hyderabad B) Bangalore
C) Both A & B D) Delhi
 
Answer & Explanation Answer: B) Bangalore

Explanation:

Indian Institute of Science (IISc) is a scientific research university located in Bangalore.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Geography
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

0 2237
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2237
Q:

What is a deadlock?

Answer

Deadlock is a situation where a group of processes are all blocked and none of them can become unblocked until one of the other becomes unblocked. The simplest deadlock is two processes each of which is waiting for a message from the other.

Report Error

View answer Workspace Report Error Discuss

1 2237