Bank Exams Questions

Q:

Two trains are running with speeds 30 kmph and 58 kmph respectively in the same direction. A man in the slower train passes the faster train in 18 seconds. Find the length of the faster train?

A) 105 mts B) 115 mts
C) 120 mts D) 140 mts
 
Answer & Explanation Answer: D) 140 mts

Explanation:

Speeds of two trains = 30 kmph and 58 kmph

=> Relative speed = 58 - 30 = 28 kmph = 28 x 5/18 m/s = 70/9 m/s

Given a man takes time to cross length of faster train = 18 sec

 

Now, required Length of faster train = speed x time = 70/9  x  18 = 140 mts.

Report Error

View Answer Report Error Discuss

3 7983
Q:

It costs Rs. p each to send the first thousand messsages and Rs. q to send each subsequent one . If r is greater than 1,000, how many Rupees will it cost to send r messages ?

A) 1000 (r - p) + pq B) 1000 p + qr
C) 1000 (r - q) + pr D) 1000(p - q) + qr
 
Answer & Explanation Answer: D) 1000(p - q) + qr

Explanation:

We need to find the total cost to send r messsages, r > 1000.

The first 1000 messsages will cost Rs.p each (Or) 

The total cost of first 1000 messsages = Rs.1000p

The remaining (r - 1000) messsages will cost Rs.q each (Or)

The cost of the (r - 1000) = Rs.(r - 1000)y

 

Therefore, total cost = 1000p + rq - 1000q

= 1000(p - q) + qr

Report Error

View Answer Report Error Discuss

Filed Under: Average
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

15 7981
Q:

In Microsoft Word, _______ provides options to switch between Normal, Web Layout, Print Layout, Outline and Reading Views.

 

A) Standard tool bar B) View Buttons
C) Formatting tool bar D) Tab stop
 
Answer & Explanation Answer: B) View Buttons

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Computer
Exam Prep: Bank Exams

46 7981
Q:

An individual deposited 20% of 25% of 30% of what he had into his account with a bank. If he deposited Rs.750, how much was he having initially with him before depositing ?

A) Rs. 38000 B) Rs. 47000
C) Rs. 50000 D) Rs. 35000
 
Answer & Explanation Answer: C) Rs. 50000

Explanation:

Let 'x' be the amount he had in the bank.

=> 20/100(25/100(30/100(x))) = 750

x = 750 x 8000/120 = Rs. 50000

Report Error

View Answer Report Error Discuss

Filed Under: Percentage
Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Bank Clerk , Bank PO

5 7977
Q:

A fair coin is tossed 11 times. What is the probability that only the first two tosses will yield heads ?

A) (1/2)^11 B) (9)(1/2)
C) (11C2)(1/2)^9 D) (1/2)
 
Answer & Explanation Answer: A) (1/2)^11

Explanation:

Probability of occurrence of an event, 

P(E) = Number of favorable outcomes/Numeber of possible outcomes = n(E)/n(S)


⇒ Probability of getting head in one coin = ½, 

⇒ Probability of not getting head in one coin = 1- ½ = ½, 

Hence, 

All the 11 tosses are independent of each other.

∴ Required probability of getting only 2 times heads =122×129=1211

Report Error

View Answer Report Error Discuss

Filed Under: Probability
Exam Prep: GATE , CAT , Bank Exams , AIEEE
Job Role: Bank PO , Bank Clerk

7 7975
Q:

Loiter : Dwandle :: Impugn : ?

A) Revenge B) Confiscate
C) Gamble D) Challenge
 
Answer & Explanation Answer: D) Challenge

Explanation:

The words in each pair are synonyms of each other.

Report Error

View Answer Report Error Discuss

Filed Under: Analogy
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

15 7972
Q:

If Reena’s age was twice of her present age, when subtracted from four times three years from hence, with three times the three years before her present age. What will be her age after one year ?

A) 22 yrs B) 21 yrs
C) 20 yrs D) 24 yrs
 
Answer & Explanation Answer: A) 22 yrs

Explanation:

Let Reena’s present age be 'K' yrs.
Given:{(K+3) x 4} - {(K-3) x 3)}
=> K = 21 yrs
So her present age is 21 yrs.
Then, her age after 1 year is 22 yrs.

Report Error

View Answer Report Error Discuss

Filed Under: Problems on Ages
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Bank Clerk , Bank PO

6 7971
Q:

The boring of India’s first underwater rail tunnel has completed under which river  ?

A) Hooghly River B) Kaveri River
C) Godavari River D) Krishna River
 
Answer & Explanation Answer: A) Hooghly River

Explanation:

The boring of India’s first underwater rail tunnel under the Hooghly River for establishing metro link between Howrah and Kolkata has completed before its scheduled deadline of July 2017. The tunnel is 16.6 km long, out of which 10.8 km runs under the ground. Of this 10.8 km, 502 metres is under the water and the whole thing connects Howrah to the west and Salt lake to the east. It will have 12 stations and six will be underground. Estimated cost of the entire project is $750 million or about Rs 5,000 crores. The final commissioning of the project is expected by December 2019, following which it will be operational. The project is built by Afcons Transtonnelstroy and implemented by Kolkata Metro Railway Corporation Ltd (KMRCL).

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Bank Clerk

5 7961