Questions

Q:

Which period in history, is known as '100 days'?

Answer

The interval of time between Napoleon's escape from Elba and his abdication after the Battle of Waterloo

Report Error

View answer Workspace Report Error Discuss

Subject: World History

1 2161
Q:

In Geography, who propounded the theory of convectional current Hypothesis?

A) Carl Ritter B) Immanuel Kant
C) Arthur Holmes D) Arnaldo Faustini
 
Answer & Explanation Answer: C) Arthur Holmes

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

2 2161
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


How was the fund for pipeline - construction generated?

A) 8 major oil companies joined hands to share the cost B) 8 major oil companies borrowed $8 billion.
C) A single private company raised $8 billion D) Oil rights were sold to 8 major oil companies
 
Answer & Explanation Answer: A) 8 major oil companies joined hands to share the cost

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2161
Q:

In the following questions, one part of the sentence may have an error. Find out which part of the sentence has an error and click the button corresponding to it. If the sentence is free from error, click the "No error" option.

She enquired from the stranger (A)/ who was he and (B)/ what he wanted from her. (C)/ No Error (D)

A) A B) B
C) C D) D
 
Answer & Explanation Answer: B) B

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2160
Q:

The IMBEX 2018-19 started between India and which country?

A) Afghanistan B) Myanmar
C) China D) Nepal
 
Answer & Explanation Answer: B) Myanmar

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: World Geography
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2160
Q:

Project Scope Management

What are the Project Management Processes included in the Project Scope Management?

Answer

Scope Planning - Creating a project scope management plan that documents how the project scope will be defined,verified, controlled, and how the work breakdown structure (WBS) will be created and defined.


Scope Definition - Developing a detailed project scope statement as the basis for future project decisions.


Create WBS - Subdividing the major project deliverables and project work into smaller, more manageable components


Scope Verification - Formalizing acceptance of the completed project deliverables.


Scope Control - Controlling changes to the project scope.

Report Error

View answer Workspace Report Error Discuss

0 2160
Q:

Who is the winner of World Women's Senior Snooker Championship 2014?

Answer

Chitra Magimairaj

Report Error

View answer Workspace Report Error Discuss

Subject: Sports

2 2160
Q:

Which organelles supply energy to the cell?

A) Mitochondria B) Cytoplasm
C) Ribosomes D) None of the above
 
Answer & Explanation Answer: A) Mitochondria

Explanation:

Mitochondria which is present in both plant and animal cells supplies energy to the cells and hence called as the powerhouse of the cell.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 2160