Questions

Q:

Rabindranath Tagore was awarded Noble Prize for his literary work named

A) Geetanjali B) Rajtarangini
C) Chokher Bali D) None of these
 
Answer & Explanation Answer: A) Geetanjali

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Books and Authors

2 4302
Q:

Not including the sun, the closest stars to earth are

A) 4300 light-years away B) 430 light-years away
C) 43 light-years away D) 4.3 light-years away
 
Answer & Explanation Answer: D) 4.3 light-years away

Explanation:

The nearest stars to Earth are in the Alpha Centauri triple-star system, about 4.37 light-years away. One of these stars, Proxima Centauri, is slightly closer, at 4.26 light-years.

 

Of all the stars closer than 15 light-years, only two are spectral type G, similar to our sun: Alpha Centauri A and Tau Ceti. The majority are M-type red dwarf stars.

 

Only nine of the stars in this area is bright enough to be seen by the naked human eye from Earth. These brightest stars include Alpha Centauri A and B, Sirius A, Epsilon Eridani, Procyon, 61 Cygni A and B, Epsilon Indi A and Tau Ceti.

Report Error

View Answer Report Error Discuss

2 4301
Q:

What does preceded in death mean?

Answer

We know that, preceeded means to come before. 


Hence, the given sentence, preceded in death means that person had died before this person.


 


For example :: Rahul preceeded Ravi in death, means Rahul died before Ravi.

Report Error

View answer Workspace Report Error Discuss

Subject: English Exam Prep: Bank Exams , CAT , GRE , TOEFL
Job Role: Analyst , Bank Clerk , Bank PO

2 4301
Q:

What do you call elements with Atomic Number between 57 and 71?

Answer

'Rare earth'(They are all metals)

Report Error

View answer Workspace Report Error Discuss

Subject: General Science

10 4299
Q:

An important tool for project scope management is

A) Fast tracking B) Work breakdown structure
C) Crashing D) A Gantt Chart
 
Answer & Explanation Answer: B) Work breakdown structure

Explanation:

Work breakdown structure is an important tool for project scope management.

 

Project Scope Management refers to the set of processes that ensure a project’s scope is accurately defined and mapped. Scope Management techniques enable project managers and supervisors to allocate just the right amount of work necessary to successfully complete a project—concerned primarily with controlling what is and what is not part of the project’s scope.

Report Error

View Answer Report Error Discuss

14 4298
Q:

Electric current is measured by which instrument?

A) voltmeter B) ammeter
C) barometer D) sinometer
 
Answer & Explanation Answer: B) ammeter

Explanation:

Electric current is measured by the instrument called ammeter. As current in a circuit is measured in amperes, the instrument used is called as ammeter.

Electric_current_is_measured_by_which_instrument1555505098.jpg image

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 4297
Q:

When a computer prints a report this output is called

A) Soft copy B) Hard copy
C) Printing D) Program
 
Answer & Explanation Answer: B) Hard copy

Explanation:

Hard copy is the output which is printed by the computer.

Report Error

View Answer Report Error Discuss

3 4295
Q:

The command center of fluid intake is located in the

A) Hypothalamus B) Adrenal glands
C) Kidneys D) None of the above
 
Answer & Explanation Answer: A) Hypothalamus

Explanation:

The command center of fluid intake is located in the Hypothalamus.

Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 4295