Q:

Which membrane is highly convoluted?

A) the chloroplast outer membrane B) chloroplast inner membrane
C) both the mitochondrial and chloroplast outer membranes D) mitochondrial inner membrane
 
Answer & Explanation Answer: D) mitochondrial inner membrane

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Biology
Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

3 2561
Q:

Read the passage carefully and choose the best answer to each question out of the four alternatives and click the button corresponding to it.

The Alaska pipeline starts at the frozen edge of the Arctic Ocean. It stretches southward across the largest and northernmost state in the United States, ending at a remote ice-free seaport village nearly 800 miles from where it begins. It is massive in size and extremely complicated to operate. The steel pipe crosses windswept plains and endless miles of delicate tundra that tops the frozen ground. It weaves through crooked canyons, climbs sheer mountains, plunges over rocky crags, makes its way through thick forests, and passes over or under hundreds of rivers and streams. The pipe is 4 feet in diameter, and up to 2 million barrels (or 84 million gallons) of crude oil can be pumped through it daily. Resting on H-shaped steel racks called "bents", long sections of the pipeline follow a zigzag course high above the frozen earth. Other long sections drop out of sight beneath spongy or rocky ground and return to the surface later on. The pattern of the pipeline's up-and-down route is determined by the often harsh demands of the arctic and subarctic climate, the tortuous lay of the land, and the varied compositions of soil, rock, or permafrost (permanently frozen ground). A little more than half of the pipeline is elevated above the ground. The remainder is buried anywhere from 3 to 12 feet, depending largely upon the type of terrain and the properties of the soil. One of the largest in the world, the pipeline cost approximately $8 billion and is by far the biggest and most expensive construction project ever undertaken by private industry. In fact, no single business could raise that much money, so 8 major oil companies formed a consortium in order to share the costs. Each company controlled oil rights to particular shares of land in the oil fields and paid into the pipeline-construction fund according to the size of its holdings. Today, despite enormous problems of climate, supply shortage, equipment breakdowns, labour disagreements, treacherous terrain, a certain amount of mismanagement, and even theft, the Alaska pipeline has been completed and is operating.


What is the capacity of the Alaskan pipeline?

A) 2 million gallons of crude oil B) 4 million barrels of crude oil
C) 84 million gallons of crude oil D) 84 billion barrels of crude oil
 
Answer & Explanation Answer: C) 84 million gallons of crude oil

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2561
Q:

Which of the following programme is launched to develop basic infrastucture in the country

A) Bharat Nirman Programme B) Technical Mission
C) Special Economic Zones D) None of these
 
Answer & Explanation Answer: A) Bharat Nirman Programme

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy

0 2560
Q:

The fish that can taste with its whole body?

A) Tropical cockroach B) Arctic tern
C) Catfish D) Koala
 
Answer & Explanation Answer: C) Catfish

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: General Science
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2560
Q:

Project Procurement Management - Processes

Describe the Inputs, Tools and Techniques , Outputs included in the Select Sellers?

Answer

I. Inputs



  • Organizational process assets

  • Procurement management plan

  • Evaluation criteria

  • Procurement document package

  • Proposals

  • Qualified sellers list

  • Project management plan


                 - Risk register


                 - Risk related contractual agreements


II. Tools and Techniques



  • Weighting system

  • Independent estimates

  • Screening system

  • Contract negotiation

  • Seller rating systems

  • Expert judgment

  • Proposal evaluation techniques


III. Outputs



  • Selected sellers

  • Contract

  • Contract management plan

  • Resource availability

  • Procurement management plan (updates)

  • Requested changes

Report Error

View answer Workspace Report Error Discuss

0 2560
Q:

Business fluctuations refer to

A) the ups and downs in overall business B) expansion is rapid
C) contraction is severe D) None of the above
 
Answer & Explanation Answer: A) the ups and downs in overall business

Explanation:

Business fluctuations refer to the ups and downs in overall business activity measured by changes in national​ income, employment and the price level.

Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2559
Q:

The chairman of the RBI's committee constituted to review the governance of boards of banks in india

Answer

P J Nayak

Report Error

View answer Workspace Report Error Discuss

0 2559
Q:

A series is given with one term missing. Choose the correct alternative from the given ones that will complete the series.
BC, GHI, NOPQ, ?

A) BCDEF B) UVWXY
C) WXYZA D) STUVW
 
Answer & Explanation Answer: C) WXYZA

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: English
Exam Prep: Bank Exams

0 2558