Questions

Q:

Market imperfections of a country are reflected in___________.

A) price rigidity B) factor immobility
C) lack of specialization D) All options are correct
 
Answer & Explanation Answer: D) All options are correct

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Indian Economy
Exam Prep: Bank Exams

1 2973
Q:

CFS Scheme means

A) Concessional Financing Scheme B) Controversial Fylum Scheme
C) Country Federation Scheme D) None of the above
 
Answer & Explanation Answer: A) Concessional Financing Scheme

Explanation:

CFS Scheme means Concessional Financing Scheme. 

Under the CFS, the Govt. of India has been supporting Indian Entities bidding for strategically important infrastructure projects abroad since 2015-16.

 

The Union Cabinet has recently approved Extension of Concessional Financing Scheme (CFS) to support Indian Entities bidding for strategically important infrastructure projects abroad.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2973
Q:

Who decides to implement split MOPP?

Answer

The concept of maintaining heightened protective posture only in those areas (or zones) that are contaminated, allowing personnel in uncontaminated areas to continue to operate in a reduced posture. Also called split-MOPP. Airbases or operating locations are divided into sectors allowing MOPP levels and alarm conditions to be adjusted based on the level of threat.


 


The installation commander decides to implement Split MOPP concept when and where ever necessary.

Report Error

View answer Workspace Report Error Discuss

Subject: General Awareness Exam Prep: AIEEE , Bank Exams
Job Role: Analyst , Bank Clerk , Bank PO

1 2973
Q:

Who is the Chief Election Commissioner of India 2018?

A) Ashok Lavasa B) Om Prakash Rawat
C) Montek Singh Ahluwalia D) Sunil Arora
 
Answer & Explanation Answer: B) Om Prakash Rawat

Explanation:

Om Prakash Rawat is the Chief Election Commissioner of India where Ashok Lavasa & Sunil Arora are the Election Commissioners of India. The Election Commission of India had announced Assembly elections for 5 states recently.

Report Error

View Answer Report Error Discuss

Filed Under: General Awareness
Exam Prep: AIEEE , Bank Exams , CAT
Job Role: Analyst , Bank Clerk , Bank PO

3 2973
Q:

which is a best way to measure Ground Distance?

Answer

Pace Count is a way to measure to Ground Distance.


Pace Count is nothing but regular single natural step of about 30 inches long.

Report Error

View answer Workspace Report Error Discuss

Subject: Physics Exam Prep: AIEEE , Bank Exams , CAT , GATE , GRE
Job Role: Analyst , Bank PO

7 2973
Q:

Acceptable noise level for human ear

A) > 85 db B) = 85 db
C) < 85 db D) None of the above
 
Answer & Explanation Answer: C) < 85 db

Explanation:

Sound intensity or level is measured by a unit called a decibel. An 85 decibel noise level is not a safe standard for the public.

 

Hence, Acceptable noise level for human ear is less than 85 db.

Report Error

View Answer Report Error Discuss

Filed Under: Physics
Exam Prep: AIEEE , Bank Exams , CAT , GATE
Job Role: Analyst , Bank Clerk , Bank PO

2 2973
Q:

Titan industries has rolled out its own Swiss made premium watches in India under the brand Name of 

A) Insignia B) Xylys
C) Bvlgeri D) Titan Sens
 
Answer & Explanation Answer: B) Xylys

Explanation:
Report Error

View Answer Report Error Discuss

Filed Under: Business Awareness

5 2972
Q:

Project Risk Management

What are the Project Management Processes included in the Project Risk Management? 

Answer

The Project Risk Management Processes include the following:


Risk Management Planning - Deciding how to approach , plan, and execute the risk management activities for a project


Risk Identification - Determining which risks might affect the project and documenting their characteristics.


Qualitative Risk Analysis - Prioritizing risks for subsequent further analysis or action by assessing and combining their probability of occurrence and impact


Quantitative Risk Analysis - Numerically analyzing the effect on overall project objectives of identified risks


Risk Response Planning - Developing options and actions to enhance opportunities , and to reduce threats to project objectives.


Risk Monitoring and Control - Tracking identified risks, monitoring residual risks, identifying new risks, executing risk response plans, and evaluating their effectiveness throughout the project life cycle.

Report Error

View answer Workspace Report Error Discuss

0 2972